Research Article

Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation

Volume: 16 Number: 4 December 16, 2023
EN TR

Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation

Abstract

This research aims to enhance the accuracy of Construction Cost Index (CCI) forecasting using Holt-Winters exponential smoothing (ES) by optimizing its parameters, focusing on minimizing the Mean Absolute Percentage Error (MAPE) for precise CCI forecasts. To reach this aim, The Holt-Winters model parameters are optimized through Particle Swarm Optimization (PSO) and Walk-Forward Cross-Validation (WFCV). PSO, a metaheuristic optimization algorithm, is being applied to search for optimal values of the smoothing parameters (alpha, beta, and gamma) that determine the weightage of past observations, trends, and seasonality, respectively. WFCV is assessed the model's performance and ensures robustness. Reduced MAPEs of 22 for CCI forecasts and 2 for training data are the findings of the optimized Holt-Winters model. The obtained alpha, beta, and gamma values are 0.99, 0.77, and 0, respectively, highlighting the importance of while neglecting seasonality. Convergence graphs demonstrate the superiority of the optimization approach over conventional parameter values or random selections. By employing PSO and WFCV, the study efficiently fine-tunes the Holt-Winters model for precise CCI forecasting. Optimized parameter values enable data driven decision-making in construction project cost estimation and budget management. This research contributes a reliable and robust optimization methodology for CCI forecasting, supporting advancements in the field.

Keywords

References

  1. Ashuri, B., & Lu, J. (2010). Time Series Analysis of ENR Construction Cost Index. Journal of Construction Engineering and Management-asce, 136, 1227-1237.
  2. Ashuri, B., & Shahandashti, S.M. (2012). Quantifying the Relationship between Construction Cost Index (CCI) and Macroeconomic Factors in the United States.
  3. Aydınlı, S. (2022). Time series analysis of building construction cost index in Türkiye. Journal of Construction Engineering, Management & Innovation (Online), 5(4).
  4. Berrar, D. (2019). Cross-Validation. Encyclopedia of Bioinformatics and Computational Biology, 1(April), 542-545.
  5. Choi, C., Ryu, K.R., & Shahandashti, M. (2021). Predicting City-Level Construction Cost Index Using Linear Forecasting Models. Journal of Construction Engineering and Management-asce, 147, 04020158.
  6. Fachrurrazi (2016). Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building. International journal of engineering research and technology, 5.
  7. Jiang, F., Awaitey, J., & Xie, H. (2022). Analysis of construction cost and investment planning using time series data. Sustainability, 14(3), 1703.
  8. Joukar, A., & Nahmens, I. (2016). Volatility Forecast of Construction Cost Index Using General Autoregressive Conditional Heteroskedastic Method. Journal of Construction Engineering and Management-asce, 142, 04015051.

Details

Primary Language

English

Subjects

Architecture Management, Architecture (Other)

Journal Section

Research Article

Publication Date

December 16, 2023

Submission Date

August 15, 2023

Acceptance Date

October 23, 2023

Published in Issue

Year 2023 Volume: 16 Number: 4

APA
Tüz Ebesek, Ö., & Ebesek, Ş. (2023). Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation. Kent Akademisi, 16(4), 2422-2439. https://doi.org/10.35674/kent.1343590
AMA
1.Tüz Ebesek Ö, Ebesek Ş. Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation. Urban Academy. 2023;16(4):2422-2439. doi:10.35674/kent.1343590
Chicago
Tüz Ebesek, Özlem, and Şafak Ebesek. 2023. “Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting With PSO and Walk-Forward Cross-Validation”. Kent Akademisi 16 (4): 2422-39. https://doi.org/10.35674/kent.1343590.
EndNote
Tüz Ebesek Ö, Ebesek Ş (December 1, 2023) Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation. Kent Akademisi 16 4 2422–2439.
IEEE
[1]Ö. Tüz Ebesek and Ş. Ebesek, “Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation”, Urban Academy, vol. 16, no. 4, pp. 2422–2439, Dec. 2023, doi: 10.35674/kent.1343590.
ISNAD
Tüz Ebesek, Özlem - Ebesek, Şafak. “Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting With PSO and Walk-Forward Cross-Validation”. Kent Akademisi 16/4 (December 1, 2023): 2422-2439. https://doi.org/10.35674/kent.1343590.
JAMA
1.Tüz Ebesek Ö, Ebesek Ş. Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation. Urban Academy. 2023;16:2422–2439.
MLA
Tüz Ebesek, Özlem, and Şafak Ebesek. “Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting With PSO and Walk-Forward Cross-Validation”. Kent Akademisi, vol. 16, no. 4, Dec. 2023, pp. 2422-39, doi:10.35674/kent.1343590.
Vancouver
1.Özlem Tüz Ebesek, Şafak Ebesek. Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation. Urban Academy. 2023 Dec. 1;16(4):2422-39. doi:10.35674/kent.1343590

Urban Academy | Journal of Urban Culture and Management / Kent Akademisi | Kent Kültürü ve Yönetimi Dergisi
Information, Communication, Art and Media Network (ICAM Network) | www.icamnetwork.net
Address: Ahmet Emin Fidan Culture and Research Center, Evkaf Neigh. No: 34 Fatsa Ordu
Tel: +90452 310 20 30 | Publication Group Mail: info@icamnetwork.net | Journal Mail:  editor@kentakademisi.com