Optimizing Holt-Winters Exponential Smoothing Parameters for Construction Cost Index Forecasting with PSO and Walk-Forward Cross-Validation
Abstract
Keywords
Construction Cost Index , Holt-Winters , Forward Cross-Validation , Particle Swarm Optimization , Parameter Optimization , Metaheuristics
Kaynakça
- Ashuri, B., & Lu, J. (2010). Time Series Analysis of ENR Construction Cost Index. Journal of Construction Engineering and Management-asce, 136, 1227-1237.
- Ashuri, B., & Shahandashti, S.M. (2012). Quantifying the Relationship between Construction Cost Index (CCI) and Macroeconomic Factors in the United States.
- Aydınlı, S. (2022). Time series analysis of building construction cost index in Türkiye. Journal of Construction Engineering, Management & Innovation (Online), 5(4).
- Berrar, D. (2019). Cross-Validation. Encyclopedia of Bioinformatics and Computational Biology, 1(April), 542-545.
- Choi, C., Ryu, K.R., & Shahandashti, M. (2021). Predicting City-Level Construction Cost Index Using Linear Forecasting Models. Journal of Construction Engineering and Management-asce, 147, 04020158.
- Fachrurrazi (2016). Study of Unit Price for Competitive Bidding Based on CCI (Construction Cost Index) for Building. International journal of engineering research and technology, 5.
- Jiang, F., Awaitey, J., & Xie, H. (2022). Analysis of construction cost and investment planning using time series data. Sustainability, 14(3), 1703.
- Joukar, A., & Nahmens, I. (2016). Volatility Forecast of Construction Cost Index Using General Autoregressive Conditional Heteroskedastic Method. Journal of Construction Engineering and Management-asce, 142, 04015051.
- Liu, H., Kwigizile, V., & Huang, W. (2021). Holistic Framework for Highway Construction Cost Index Development Based on Inconsistent Pay Items. Journal of Construction Engineering and Management.
- Marini, F., & Walczak, B. (2015). Particle swarm optimization. A tutorial. Chemometrics and Intelligent Laboratory Systems, 149, 153-165.