Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction

Year 2009, Volume: 48 Issue: 2, 21 - 34, 01.06.2009

YENİ İTALYAN TÜNEL AÇMA YÖNTEMİ’NİN GELİŞİM SÜRECİ ve İZMİR METROSU BORNOVA TÜNEL İNŞAATI ÖN DESTEK TASARIMINDA UYGULANMASI

Year 2009, Volume: 48 Issue: 2, 21 - 34, 01.06.2009
There are 0 citations in total.

Details

Other ID JA82SH26TM
Journal Section Research Article
Authors

Turgay Onargan This is me

Mete Kun This is me

Çağatay Pamukçu This is me

C. Okay Aksoy This is me

Publication Date June 1, 2009
Submission Date June 1, 2009
Published in Issue Year 2009 Volume: 48 Issue: 2

Cite

APA Onargan, T., Kun, M., Pamukçu, Ç., Aksoy, C. O. (2009). Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction. Scientific Mining Journal, 48(2), 21-34.
AMA Onargan T, Kun M, Pamukçu Ç, Aksoy CO. Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction. Mining. June 2009;48(2):21-34.
Chicago Onargan, Turgay, Mete Kun, Çağatay Pamukçu, and C. Okay Aksoy. “Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction”. Scientific Mining Journal 48, no. 2 (June 2009): 21-34.
EndNote Onargan T, Kun M, Pamukçu Ç, Aksoy CO (June 1, 2009) Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction. Scientific Mining Journal 48 2 21–34.
IEEE T. Onargan, M. Kun, Ç. Pamukçu, and C. O. Aksoy, “Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction”, Mining, vol. 48, no. 2, pp. 21–34, 2009.
ISNAD Onargan, Turgay et al. “Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction”. Scientific Mining Journal 48/2 (June 2009), 21-34.
JAMA Onargan T, Kun M, Pamukçu Ç, Aksoy CO. Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction. Mining. 2009;48:21–34.
MLA Onargan, Turgay et al. “Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction”. Scientific Mining Journal, vol. 48, no. 2, 2009, pp. 21-34.
Vancouver Onargan T, Kun M, Pamukçu Ç, Aksoy CO. Development Procedure of the New Italian Tunnelling Method and Its Application in Pre Support Design at İzmir Metro Bornova Tunnel Construction. Mining. 2009;48(2):21-34.

22562 22561 22560 22590 22558