BibTex RIS Cite

The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway

Year 1999, Volume: 38 Issue: 3, 31 - 35, 01.06.1999

Abstract

In this study, the performance analysis of the hydraulic top hammer drills used in the construction of Pozantı-Tarsus crossing motorway was described. The performance of drills was analysed by using Drill Rig Availability (DRA) and Drill Rig Usage (DRU) as evaluation criteria. It was shown that DRA of the drills conformed to international standards. But, it was found that DRU was lower than the standard values, due to the heavily jointed formation, which causes caving in the holes

POZANTI - TARSUS AYRIMI OTOYOL İNŞAATINDA KULLANILMIŞ OLAN DELİCİ MAKİNELERİN PERFORMANS ANALİZİ

Year 1999, Volume: 38 Issue: 3, 31 - 35, 01.06.1999

Abstract

Bu çalışmada, Pozantı-Tarsus ayrımı otoyol inşaatında kullanılmış olan yerüstünden darbeli hidrolik deliciler üzerinde yapılan performans analizi anlatılmıştır. Performans analizinde değerlendirme kriteri olarak Makine Kullanılabilirlik Oram (MKO) ve Makineden Faydalanma Oram (MFO) kullanılmıştu:. Yapılan performans analizi sonucunda delicilerin MKO' larınm uluslararası standartlara uygun olduğu görülmüştür. Fakat MFO değerleri standart değerlerden düşük çıkmıştır. Bu durumun formasyonların çok kırıklı-çatlaklı olması nedeniyle delikte göçükler meydana getirmesinden ileri geldiği sonucuna varılmıştır

There are 0 citations in total.

Details

Other ID JA42FE35KM
Journal Section Research Article
Authors

Sair Kahraman This is me

Ayhan Mülazımoğlu This is me

Publication Date June 1, 1999
Submission Date June 1, 1999
Published in Issue Year 1999 Volume: 38 Issue: 3

Cite

APA Kahraman, S., & Mülazımoğlu, A. (1999). The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Scientific Mining Journal, 38(3), 31-35.
AMA Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. June 1999;38(3):31-35.
Chicago Kahraman, Sair, and Ayhan Mülazımoğlu. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal 38, no. 3 (June 1999): 31-35.
EndNote Kahraman S, Mülazımoğlu A (June 1, 1999) The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Scientific Mining Journal 38 3 31–35.
IEEE S. Kahraman and A. Mülazımoğlu, “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”, Mining, vol. 38, no. 3, pp. 31–35, 1999.
ISNAD Kahraman, Sair - Mülazımoğlu, Ayhan. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal 38/3 (June 1999), 31-35.
JAMA Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. 1999;38:31–35.
MLA Kahraman, Sair and Ayhan Mülazımoğlu. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal, vol. 38, no. 3, 1999, pp. 31-35.
Vancouver Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. 1999;38(3):31-5.

22562 22561 22560 22590 22558