Total Completion Time Scheduling Problem with Temperature Considerations

Volume: 5 Number: 2 December 31, 2016
EN

Total Completion Time Scheduling Problem with Temperature Considerations

Abstract

The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time (square) problem. We derive solutions with polynomial-time for both objectives.

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Publication Date

December 31, 2016

Submission Date

January 5, 2016

Acceptance Date

-

Published in Issue

Year 2016 Volume: 5 Number: 2

APA
Toksarı, M. (2016). Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim Ve Teknoloji Dergisi, 5(2), 185-192. https://doi.org/10.17100/nevbiltek.284741
AMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5(2):185-192. doi:10.17100/nevbiltek.284741
Chicago
Toksarı, M.duran. 2016. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi 5 (2): 185-92. https://doi.org/10.17100/nevbiltek.284741.
EndNote
Toksarı M (December 1, 2016) Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi 5 2 185–192.
IEEE
[1]M. Toksarı, “Total Completion Time Scheduling Problem with Temperature Considerations”, Nevşehir Bilim ve Teknoloji Dergisi, vol. 5, no. 2, pp. 185–192, Dec. 2016, doi: 10.17100/nevbiltek.284741.
ISNAD
Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5/2 (December 1, 2016): 185-192. https://doi.org/10.17100/nevbiltek.284741.
JAMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5:185–192.
MLA
Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi, vol. 5, no. 2, Dec. 2016, pp. 185-92, doi:10.17100/nevbiltek.284741.
Vancouver
1.M.duran Toksarı. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016 Dec. 1;5(2):185-92. doi:10.17100/nevbiltek.284741