Total Completion Time Scheduling Problem with Temperature Considerations
Öz
The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time (square) problem. We derive solutions with polynomial-time for both objectives.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Yayımlanma Tarihi
31 Aralık 2016
Gönderilme Tarihi
5 Ocak 2016
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2016 Cilt: 5 Sayı: 2
APA
Toksarı, M. (2016). Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi, 5(2), 185-192. https://doi.org/10.17100/nevbiltek.284741
AMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5(2):185-192. doi:10.17100/nevbiltek.284741
Chicago
Toksarı, M.duran. 2016. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5 (2): 185-92. https://doi.org/10.17100/nevbiltek.284741.
EndNote
Toksarı M (01 Aralık 2016) Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi 5 2 185–192.
IEEE
[1]M. Toksarı, “Total Completion Time Scheduling Problem with Temperature Considerations”, Nevşehir Bilim ve Teknoloji Dergisi, c. 5, sy 2, ss. 185–192, Ara. 2016, doi: 10.17100/nevbiltek.284741.
ISNAD
Toksarı, M.duran. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5/2 (01 Aralık 2016): 185-192. https://doi.org/10.17100/nevbiltek.284741.
JAMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5:185–192.
MLA
Toksarı, M.duran. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi, c. 5, sy 2, Aralık 2016, ss. 185-92, doi:10.17100/nevbiltek.284741.
Vancouver
1.M.duran Toksarı. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 01 Aralık 2016;5(2):185-92. doi:10.17100/nevbiltek.284741