Total Completion Time Scheduling Problem with Temperature Considerations

Cilt: 5 Sayı: 2 31 Aralık 2016
PDF İndir
EN

Total Completion Time Scheduling Problem with Temperature Considerations

Öz

The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time (square) problem. We derive solutions with polynomial-time for both objectives.

Ayrıntılar

Birincil Dil

Türkçe

Konular

-

Bölüm

-

Yayımlanma Tarihi

31 Aralık 2016

Gönderilme Tarihi

5 Ocak 2016

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2016 Cilt: 5 Sayı: 2

Kaynak Göster

APA
Toksarı, M. (2016). Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi, 5(2), 185-192. https://doi.org/10.17100/nevbiltek.284741
AMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5(2):185-192. doi:10.17100/nevbiltek.284741
Chicago
Toksarı, M.duran. 2016. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5 (2): 185-92. https://doi.org/10.17100/nevbiltek.284741.
EndNote
Toksarı M (01 Aralık 2016) Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi 5 2 185–192.
IEEE
[1]M. Toksarı, “Total Completion Time Scheduling Problem with Temperature Considerations”, Nevşehir Bilim ve Teknoloji Dergisi, c. 5, sy 2, ss. 185–192, Ara. 2016, doi: 10.17100/nevbiltek.284741.
ISNAD
Toksarı, M.duran. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5/2 (01 Aralık 2016): 185-192. https://doi.org/10.17100/nevbiltek.284741.
JAMA
1.Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5:185–192.
MLA
Toksarı, M.duran. “Total Completion Time Scheduling Problem with Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi, c. 5, sy 2, Aralık 2016, ss. 185-92, doi:10.17100/nevbiltek.284741.
Vancouver
1.M.duran Toksarı. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 01 Aralık 2016;5(2):185-92. doi:10.17100/nevbiltek.284741

Dergimizin tarandığı indeksler


 

12300          20980     20978