Total Completion Time Scheduling Problem with Temperature Considerations

Yıl 2016, , 185 - 192, 31.12.2016
https://doi.org/10.17100/nevbiltek.284741

Öz

The focus of this work is to analyze working environment temperature in single-machine scheduling problems. In classical scheduling problems, the processing times are considered usually without the effect of working environment temperature. However, in many real scheduling environments, working environment temperature may affect processing time due to the nature of work. In this paper, we present job processing times based on the working environment temperature for total completion time (square) problem. We derive solutions with polynomial-time for both objectives.

Yıl 2016, , 185 - 192, 31.12.2016
https://doi.org/10.17100/nevbiltek.284741

Öz

Toplam 0 adet kaynakça vardır.

Ayrıntılar

Bölüm Endüstri Mühendisliği
Yazarlar

M.duran Toksarı

Yayımlanma Tarihi 31 Aralık 2016
Yayımlandığı Sayı Yıl 2016

Kaynak Göster

APA Toksarı, M. (2016). Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim Ve Teknoloji Dergisi, 5(2), 185-192. https://doi.org/10.17100/nevbiltek.284741
AMA Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. Aralık 2016;5(2):185-192. doi:10.17100/nevbiltek.284741
Chicago Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi 5, sy. 2 (Aralık 2016): 185-92. https://doi.org/10.17100/nevbiltek.284741.
EndNote Toksarı M (01 Aralık 2016) Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi 5 2 185–192.
IEEE M. Toksarı, “Total Completion Time Scheduling Problem with Temperature Considerations”, Nevşehir Bilim ve Teknoloji Dergisi, c. 5, sy. 2, ss. 185–192, 2016, doi: 10.17100/nevbiltek.284741.
ISNAD Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim ve Teknoloji Dergisi 5/2 (Aralık 2016), 185-192. https://doi.org/10.17100/nevbiltek.284741.
JAMA Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5:185–192.
MLA Toksarı, M.duran. “Total Completion Time Scheduling Problem With Temperature Considerations”. Nevşehir Bilim Ve Teknoloji Dergisi, c. 5, sy. 2, 2016, ss. 185-92, doi:10.17100/nevbiltek.284741.
Vancouver Toksarı M. Total Completion Time Scheduling Problem with Temperature Considerations. Nevşehir Bilim ve Teknoloji Dergisi. 2016;5(2):185-92.

Dergimizin tarandığı indeksler


12300          20980     2097822081