Yapım İşlerinde Kaynak Dengeleme Problemleri İçin Sezgisel Yöntemlerin Uygulanması
Abstract
Keywords
References
- 1. Ahuja, Hira N. 1976. Construction Performance Control by Networks. New York; Toronto: Wiley.
- 2. Antill, James M, and Ronald W Woodhead. 1990. Critical Path Methods in Construction Practice. John Wiley & Sons.
- 3. Burgess, A. R., and Killebrew, J. B. 1962. “No Title.” J. Industrial Engrg (Variation in activity level on a cyclic arrow diagram): 76–83.
- 4. Harris, R. 1978. New York: John Wiley and Sons. Precedence and Arrow Networks for Construction.
- 5. Hegazy, Tarek. 1999. “Optimization of Resource Allocation and Leveling Using Genetic Algorithms.” Journal of construction engineering and management 125(3): 167–75.
- 6. Iranagh, Mahdi Abbasi, and Rifat Sonmez. 2012. “A Genetic Algorithm for Resource Leveling.” (September): 1047–54. 7. Rao, Singiresu S. 1976. 27 Journal of the Operational Research Society Engineering Optimization.
Details
Primary Language
Turkish
Subjects
Civil Engineering
Journal Section
Research Article
Publication Date
December 30, 2019
Submission Date
December 13, 2019
Acceptance Date
January 3, 2020
Published in Issue
Year 2019 Volume: 2 Number: 1