Yapım İşlerinde Kaynak Dengeleme Problemleri İçin Sezgisel Yöntemlerin Uygulanması
Öz
Anahtar Kelimeler
Kaynakça
- 1. Ahuja, Hira N. 1976. Construction Performance Control by Networks. New York; Toronto: Wiley.
- 2. Antill, James M, and Ronald W Woodhead. 1990. Critical Path Methods in Construction Practice. John Wiley & Sons.
- 3. Burgess, A. R., and Killebrew, J. B. 1962. “No Title.” J. Industrial Engrg (Variation in activity level on a cyclic arrow diagram): 76–83.
- 4. Harris, R. 1978. New York: John Wiley and Sons. Precedence and Arrow Networks for Construction.
- 5. Hegazy, Tarek. 1999. “Optimization of Resource Allocation and Leveling Using Genetic Algorithms.” Journal of construction engineering and management 125(3): 167–75.
- 6. Iranagh, Mahdi Abbasi, and Rifat Sonmez. 2012. “A Genetic Algorithm for Resource Leveling.” (September): 1047–54. 7. Rao, Singiresu S. 1976. 27 Journal of the Operational Research Society Engineering Optimization.
Ayrıntılar
Birincil Dil
Türkçe
Konular
İnşaat Mühendisliği
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
30 Aralık 2019
Gönderilme Tarihi
13 Aralık 2019
Kabul Tarihi
3 Ocak 2020
Yayımlandığı Sayı
Yıl 2019 Cilt: 2 Sayı: 1
