Yalın Üretim Ortamına Uygun Maliyet Sistemi Seçimi
Abstract
Keywords
References
- ALUKAL, George (2003), “Create a Lean, Mean Machiene”, Quality Progress, 36 (4), 29-34.
- ARBOS, Lluıs Cuatrecasas (2002), “Design of A Rapid Response and High Efficiency Service by Lean Production Principles: Methodology and Evaluation of Variability of Performance”, International Journal of Production, 80(2),169-183.
- BAGGALEY, Bruce ve MASKELL, Brian (2003), “Value Stream Management For Lean Companies, Part I”, Cost Management 17(2), 23-27.
- BAGGALEY, Bruce. ve MASKELL, Brian. (2003), “Value Stream Management For Lean Companies, Part II”, Cost Management 17(3), 24-30.
- BÜYÜKMİRZA, Kamil (2003), Maliyet ve Yönetim Muhasebesi, 9. Basım, Gazi Kitabevi, Ankara. CENGİZ, Emre ve UYAR, Süleyman (2011), “Geriye Doğru Maliyetleme ve Bir Üretim İşletmesinde Uygulama” Journal of Yaşar University, 22(6), 3681-3692.
- COOPER, Robin ve MASKELL, Brian (2008), “How to Manage Through Worse-Before-Better”, MIT Sloan Management Review, 49(4), 58-65.
- DUQUE, Diego Fernando Manotas ve CADAVID, L. R.,(2007), “Lean Manufacturing Measurement: The Relationship Between Lean Activities and Lean Metrics”, Estudios Gerenciales,23(105), 69-83.
- GERI, Nitza ve BOAZ, Ronen (2005), “Relevance Lost:The Rise and Fall of Activity Based Costing”, Human Systems Management, 24,133-144.
Details
Primary Language
Turkish
Subjects
-
Journal Section
-
Authors
Funda Özçelik
This is me
Publication Date
March 1, 2013
Submission Date
September 13, 2014
Acceptance Date
-
Published in Issue
Year 2013 Volume: 20 Number: 1