Araştırma Makalesi
BibTex RIS Kaynak Göster

CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY

Yıl 2019, Cilt: 58 Sayı: 1, 73 - 79, 01.03.2019
https://doi.org/10.30797/madencilik.537648

Öz

Monitored cycle times and cycle time segments of three 35 m3 electric rope shovels are given
and discussed from a bituminous coal mine in Kuzbass Coal Basin in Siberia, based on daily
monitoring reports of a four days period in May 2015. Furthermore, the results of a 45 m3 shovel
operating in Northern Europe; and the results of 12 m3 and 15 m3 electric rope shovels surveyed
by other researchers operating at Turkish coal mines are also given. Parameters like cycle times,
cycle time segments, dig times, dig time over cycle time ratios and process rates are given and
depicted, interpreted and discussed.

Kaynakça

  • Anon (a), 2018. P&H PrevailSystem® Reports, U.K.
  • Anon (b), 2016. http://www.joyglobal.com/productdetails/ 2800xpc
  • Binns, D., 2017. Personal communication, Plymouth, England.
  • Ceylanoğlu, A., 1991. Performance Monitoring of Electrical Power Shovels for Diggability Assessment in Surface Coal Mines. Ph.D. Thesis, METU, Ankara, July 1991 (Unpublished Ph.D. Dissertation).
  • Hindistan, M. A., 1997. Development of a Computer Based monitoring System and Its Usage for Power Shovels’ Monitoring. Ph.D. Thesis, METU, Ankara, November 1991 (Unpublished Ph.D. Dissertation).
  • Mohammadi, M., Rai, P., 2015. Improving Performance of Mining Equipment Through Enhancement of Speed Factor- A Case Study. Intl. Journal of Engineering, IJE Transactions C: Aspects, Vol.28, No:9, September 2015.
  • Özdoğan, M., Özdoğan, H., 2017. Field Performance of a New Generation 35 m3 Range Electric Rope Shovel (2800XPB) – A Case Study. Proceedings Book of 25th IMCET Congress, 11-14 April, 2017, Antalya, Turkey.
  • Özdoğan, M., Özdoğan, H., 2018. Field Performance of a New Generation 45 m3 Range Electric Rope Shovel (4100C) – A Case Study. https://www.researchgate. net/publication/318440839_FIELD_PERFORMANCE_ OF_A_NEW_GENERATION_45_m_3_RANGE_ ELECTRIC_ROPE_SHOVEL-PH4100C-A_Case_ Study.
Toplam 8 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Bölüm Makaleler
Yazarlar

Metin Özdoğan Bu kişi benim 0000-0001-7469-6635

Hakkı Özdoğan Bu kişi benim

Yayımlanma Tarihi 1 Mart 2019
Gönderilme Tarihi 24 Nisan 2019
Yayımlandığı Sayı Yıl 2019 Cilt: 58 Sayı: 1

Kaynak Göster

APA Özdoğan, M., & Özdoğan, H. (2019). CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY. Scientific Mining Journal, 58(1), 73-79. https://doi.org/10.30797/madencilik.537648
AMA Özdoğan M, Özdoğan H. CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY. Mining. Mart 2019;58(1):73-79. doi:10.30797/madencilik.537648
Chicago Özdoğan, Metin, ve Hakkı Özdoğan. “CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY”. Scientific Mining Journal 58, sy. 1 (Mart 2019): 73-79. https://doi.org/10.30797/madencilik.537648.
EndNote Özdoğan M, Özdoğan H (01 Mart 2019) CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY. Scientific Mining Journal 58 1 73–79.
IEEE M. Özdoğan ve H. Özdoğan, “CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY”, Mining, c. 58, sy. 1, ss. 73–79, 2019, doi: 10.30797/madencilik.537648.
ISNAD Özdoğan, Metin - Özdoğan, Hakkı. “CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY”. Scientific Mining Journal 58/1 (Mart 2019), 73-79. https://doi.org/10.30797/madencilik.537648.
JAMA Özdoğan M, Özdoğan H. CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY. Mining. 2019;58:73–79.
MLA Özdoğan, Metin ve Hakkı Özdoğan. “CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY”. Scientific Mining Journal, c. 58, sy. 1, 2019, ss. 73-79, doi:10.30797/madencilik.537648.
Vancouver Özdoğan M, Özdoğan H. CYCLE TIME SEGMENTS OF ELECTRIC ROPE SHOVELS- A CASE STUDY. Mining. 2019;58(1):73-9.