İKİ AŞAMALI STRATEJİK TEDARİKÇİ SEÇİMİNİN BULANIK TOPSIS YÖNTEMİ İLE ANALİZİ
Öz
Anahtar Kelimeler
Kaynakça
- Abo-Sina, M.A., Amer, A.H. (2005) ‘‘Extensions of TOPSIS for multiobjective large-scale nonlinear programming problems’’, Applied Mathematics and Computation, Vol.162, Issue 1, pp.243-256.
- Briggs, P., 1994, “Vendor assessment for partners in supply”, European Journal of Purchasing & Supply Management 1, 49–59.
- Bufa, F. P. ve W. M. Jackson., 1983, “A goal programming model for purchase planning”, Journal of Purchasing and Materials Management, 19(3), pp.27–34.
- Chen, C.T., 2000, “Extensions of the TOPSIS for group decisionmaking under fuzzy environment”, Fuzzy Sets and Systems, Vol. 114, pp. 1-9.
- Chen, C.T., C.T. Lin ve S.F. Huang, 2006, “A fuzzy approach for supplier evaluation and selection in supply chain management”, International Journal of Production Economics, Vol.102, pp.289-301.
- Chen, S.H., 1985, Ranking fuzzy numbers with maximizing set and minimizing set, Fuzzy Sets and Systems 17, pp.113–129.
- Chen, S.J. ve Hwang, C.L., 1992, Fuzzy Multiple Attribute Decision Making Methods and Applications, Springer-Verlag, Berlin. Choi, T.Y., Hartley, J.L., 1996, “An exploration of supplier selection practices across the supply chain”, Journal of Operations Management 14, 333–343.
- Chu, T.-C. ve Lin, Y.-C., 2003, “A fuzzy TOPSIS method for robot selection”, International Journal of Advanced Manufacturing Technology 21, pp.284–290.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Ali İhsan Özdemir
Bu kişi benim
ERCİYES ÜNİVERSİTESİ, İKTİSADİ VE İDARİ BİLİMLER FAKÜLTESİ, İŞLETME BÖLÜMÜ
Neşe Yalçın Seçme
Bu kişi benim
NEVŞEHİR ÜNİVERSİTESİ, İKTİSADİ VE İDARİ BİLİMLER FAKÜLTESİ, İŞLETME BÖLÜMÜ
Yayımlanma Tarihi
1 Aralık 2009
Gönderilme Tarihi
8 Eylül 2015
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2009 Cilt: 11 Sayı: 2