Araştırma Makalesi

A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company

Cilt: 23 Sayı: 2 1 Aralık 2021
PDF İndir
EN TR

A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company

Öz

Although the construction sector is an indispensable sector in meeting human needs, it also has negative environmental and social effects. The construction industry has environmental impacts due to its significant share in consuming scarce resources and big amount of greenhouse gas emissions to the atmosphere. It is also a labor force-intensive industry. Due to the intensity of the labor force, ignoring social concerns cause a negative social image. Consequently, taking sustainability into consideration for construction projects is of great importance in terms of solutions to social and environmental problems. Due to limited resources, it is not possible to implement every project for companies. The most suitable projects are preferred among alternative projects. The problem of project portfolio selection (PPS) is an important decision problem that companies frequently encounter. Many factors should be taken into consideration for selecting projects. In many studies in the literature, the problem of PPS is addressed only by considering economic criteria. In this study, the problem of PPS is addressed with sustainability consideration. Considering sustainability, environmental and social factors have also been taken into account besides economic factors. A hybrid fuzzy multi-criteria decision-making (FMCDM) approach has been used due to uncertainties in the decision process. In the hybrid approach, the methods of Fuzzy complex proportional assessment (F-COPRAS) and Fuzzy step-wise weight assessment ratio analysis (F-SWARA) are used together. An application is conducted for a construction company.

Anahtar Kelimeler

Kaynakça

  1. Agarwal, S., Kant, R., & Shankar, R. (2020). Evaluating solutions to overcome humanitarian supply chain management barriers: A hybrid fuzzy SWARA- fuzzy WASPAS approach. International Journal of Disaster Risk Reduction, 51, 101838.
  2. Alkan, Ö., & Albayrak, Ö.K. (2020). Ranking of renewable energy sources for regions in Turkey by fuzzy entropy based fuzzy COPRAS and fuzzy MULTIMOORA. Renewable Energy, 162, 712- 726.
  3. Amirian, H., & Sahraeian, R. (2017). Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm. Computers and Industrial Engieering, 107, 141- 149.
  4. Dhiman, H.S., & Deb, D. (2020). Fuzzy TOPSIS and fuzzy COPRAS based multi- criteria decision making for hybrid wind farms. Energy, 202, 117755.
  5. Ghorabaee, M.K., Amiri, M., Zavadskas, E.K., &Antucheviciene, J. (2018). A new hybrid fuzzy MCDM approach for evaluation of construction equipment with sustainability considerations. Archives of Civil and Mechanical Engineering, 18 (1), 32- 49.
  6. Goel, A., Ganesh, L. S., & Kaur, A. (2019). Sustainability integration in the management of construction projects: A morphological analysis of over two decades’ research literature. Journal of Cleaner Production, 236, 117676.
  7. Habibi, F., Barzinpour, F., & Sadjadi, S. J. (2019). A mathematical model for project scheduling and material ordering problem with sustainability considerations: A case study in Iran. Computers and Industrial Engineering, 128, 690- 710.
  8. Hosseininasab, S., & Shetab- Boushehri, S. (2015). Integration of selecting and scheduling urban road construction projects as a time- dependent discrete network design problem. European Journal of Operational Research, 246, 762- 771.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Aralık 2021

Gönderilme Tarihi

7 Nisan 2021

Kabul Tarihi

9 Haziran 2021

Yayımlandığı Sayı

Yıl 2021 Cilt: 23 Sayı: 2

Kaynak Göster

APA
Bektur, G. (2021). A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 23(2), 182-194. https://doi.org/10.33707/akuiibfd.911236
AMA
1.Bektur G. A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company. KOCATEPEİİBFD. 2021;23(2):182-194. doi:10.33707/akuiibfd.911236
Chicago
Bektur, Gülçin. 2021. “A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company”. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 23 (2): 182-94. https://doi.org/10.33707/akuiibfd.911236.
EndNote
Bektur G (01 Aralık 2021) A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 23 2 182–194.
IEEE
[1]G. Bektur, “A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company”, KOCATEPEİİBFD, c. 23, sy 2, ss. 182–194, Ara. 2021, doi: 10.33707/akuiibfd.911236.
ISNAD
Bektur, Gülçin. “A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company”. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi 23/2 (01 Aralık 2021): 182-194. https://doi.org/10.33707/akuiibfd.911236.
JAMA
1.Bektur G. A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company. KOCATEPEİİBFD. 2021;23:182–194.
MLA
Bektur, Gülçin. “A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company”. Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, c. 23, sy 2, Aralık 2021, ss. 182-94, doi:10.33707/akuiibfd.911236.
Vancouver
1.Gülçin Bektur. A hybrid fuzzy MCDM approach for sustainable project portfolio selection problem and an application for a construction company. KOCATEPEİİBFD. 01 Aralık 2021;23(2):182-94. doi:10.33707/akuiibfd.911236

Cited By


22365

Afyon Kocatepe Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi'nde yayınlanan tüm çalışmalar CC BY-NC 4.0 lisansı ile açık erişim ve ücretsiz olarak lisanslanmaktadır.