Araştırma Makalesi

Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector

Cilt: 2 Sayı: 2 31 Aralık 2018
PDF İndir
EN TR

Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector

Öz

The operation of salt minerals dates back hundreds of years. Salt is produced from salt rich sources through salts today. The salt (brine) obtained from existing salt sources is not in the desired purity. For this purpose, purification of the brine should be carried out to remove unwanted impurities. Brine (raw salt) also contains impurities that are soluble and insoluble except NaCl. 94-96% of the brine obtained from the salt lake contains NaCl. The remaining 4-6% are MgCl2, MgSO4, CaCl2 and other trace amounts. All of these substances are called solubility and insoluble impurities. These impurities are magnesium, calcium and sulfate .Calcium accumulation causes crust formation in the circulation line, especially heat exchangers. For this reason, heat transfer and circulation effiency decrease. The impurities from the dissolved raw salt (Ca+2, Mg +2 etc.) should be removed by the purification process. Settling tests were carried out in brine purification system. As the experimental results obtained, the magnesium and calcium from the major impurities in the brine were separately and coherently removed. NaOH was used to precipitate the magnesium and the dynamic run-out was determined to be optimum pH = 11. Na2CO3 was used to precipitate the calcium from the other major impurities in the brine. As a result of dynamic experiments, optimum precipitation pH was set at 9,5.

Anahtar Kelimeler

Kaynakça

  1. [1] Kılıç, Ö., Kılıç A.M. ve Uyanık Z., ‘‘ Tuz Gölü’nden Tuz Yan Ürünleri Üretimi/Araştırılması’’, s. 321, 2001.
  2. [2] Ergin, Z. ,Tuzun üretim Teknolojisi ve İnsan Sağlığındaki Yeri, 1988.
  3. [3] GEA-Messo-Presentation, 2012.
  4. [4] V.M. Venkatesh Mannar, ‘‘Design of Seawater Intake Facilities for Solar Salt Plants, Proceedings’’, Sixth International Symposium on Salt, vol. II, p. 289,1983.
  5. [5] Avcı, S.,‘‘Ekonomik Coğrafya Açısından Önemli Bir Maden:Tuz’’, Coğrafya Dergisi, sayı 11, s.21-45, İstanbul, 2003.
  6. [6] I.F. White and T.F. O’Brien, ‘‘Secondary Brine Treatment: Ion-Exchange Purification of Brine’’. Modern Chlor-Alkali Technology, vol.4, p.271, 1990.

Ayrıntılar

Birincil Dil

Türkçe

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yazarlar

Yayımlanma Tarihi

31 Aralık 2018

Gönderilme Tarihi

5 Kasım 2018

Kabul Tarihi

13 Aralık 2018

Yayımlandığı Sayı

Yıl 2018 Cilt: 2 Sayı: 2

Kaynak Göster

APA
Bayram, İ. (2018). Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector. International Scientific and Vocational Studies Journal, 2(2), 57-66. https://izlik.org/JA58LF53JB
AMA
1.Bayram İ. Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector. ISVOS. 2018;2(2):57-66. https://izlik.org/JA58LF53JB
Chicago
Bayram, İsmail. 2018. “Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector”. International Scientific and Vocational Studies Journal 2 (2): 57-66. https://izlik.org/JA58LF53JB.
EndNote
Bayram İ (01 Aralık 2018) Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector. International Scientific and Vocational Studies Journal 2 2 57–66.
IEEE
[1]İ. Bayram, “Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector”, ISVOS, c. 2, sy 2, ss. 57–66, Ara. 2018, [çevrimiçi]. Erişim adresi: https://izlik.org/JA58LF53JB
ISNAD
Bayram, İsmail. “Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector”. International Scientific and Vocational Studies Journal 2/2 (01 Aralık 2018): 57-66. https://izlik.org/JA58LF53JB.
JAMA
1.Bayram İ. Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector. ISVOS. 2018;2:57–66.
MLA
Bayram, İsmail. “Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector”. International Scientific and Vocational Studies Journal, c. 2, sy 2, Aralık 2018, ss. 57-66, https://izlik.org/JA58LF53JB.
Vancouver
1.İsmail Bayram. Removal of Major Impurties (Ca-Mg) of Brine with Chemical Treatment Process in the Salt Sector. ISVOS [Internet]. 01 Aralık 2018;2(2):57-66. Erişim adresi: https://izlik.org/JA58LF53JB


Creative Commons License
Creative Commons Atıf 4.0 It is licensed under an International License