Bulanık Bilişsel Haritalama İle Yalın Dönüşüm Başarı Faktörlerinin Değerlendirilmesi
Öz
Anahtar Kelimeler
Teşekkür
Kaynakça
- Anand, T. (2000). A Framework for Evaluating Erp Projects. International Journal of Production Research, 38(17), 4507-4520.
- Arnoldia, P. (2010). Factors of Successful Implementation of Erp Systems. Economics and Management, 15(8), 691-697.
- Asan, U., Kutlu, A. C. & Kadaifçi, C. (2011). Analysis of Critical Factors in Energy Service Contracting Using Fuzzy Cognitive Mapping. Proceedings of the 41st International Conference on Computers and Industrial Engineering.
- Bateman, R. (2009). Public Sector Human Resource Management Reform Across Countries: From Performance Appraisal to Performance Steering. European Journal of International Management, 3(4), 495-511.
- Karlsson, C. & Åhlstrom, P. (1996). Assessing Changes Towards Lean Production. International Journal of Operations & Production Management, 16(2), 24-41.
- Kosko, B. (1986). Fuzzy Cognitive Maps. International Journal of Man-Mach. Studies, 24(1), 65–75.
- Kottas, T. L., Boutalis, Y. S. & Christodoulou, M. A. (2010). Fuzzy Cognitive Networks: Adaptive Network Estimation and Control Paradigms. In M. Glykas (Ed.), Fuzzy Cognitive Maps: Advances in Theory, Methodologies, Tools and Applications (Pp. 89–134). Springer.
- Kumar, R. & Kumar, V. (2016). Analysis of Significant Lean Manufacturing Elements through Application of Interpretive Structural Modeling Approach İn Indian Industry, 4(1), 83-92.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yazarlar
Duygu Tüylü
*
İSTANBUL ÜNİVERSİTESİ-CERRAHPAŞA, MÜHENDİSLİK FAKÜLTESİ, ENDÜSTRİ MÜHENDİSLİĞİ BÖLÜMÜ, ENDÜSTRİ MÜHENDİSLİĞİ PR.
0000-0003-1486-6414
Türkiye
Yusuf Sait Türkan
İSTANBUL ÜNİVERSİTESİ-CERRAHPAŞA, MÜHENDİSLİK FAKÜLTESİ, ENDÜSTRİ MÜHENDİSLİĞİ BÖLÜMÜ, ENDÜSTRİ MÜHENDİSLİĞİ PR.
0000-0001-7240-183X
Türkiye
Yayımlanma Tarihi
30 Aralık 2022
Gönderilme Tarihi
17 Eylül 2022
Kabul Tarihi
4 Kasım 2022
Yayımlandığı Sayı
Yıl 2022 Cilt: 3 Sayı: 2