Kazık Nihai Taşıma Gücünün Farklı Yöntemlerle Karşılaştırmalı Analizi
Öz
Anahtar Kelimeler
Kazık Yükleme Deneyi, Nihai Taşıma Gücü, Fore Kazık, Analiz Yöntemleri
Kaynakça
- Kabaca, H. (2018). Kazıkların Taşıma Gücü ve Oturma Parametrelerinin İncelenmesi, Taşıma Gücü İçin Yeni Bir Metot Önerisi, Yüksek Lisans Tezi, Sakarya Üniversitesi, Fen Bilimleri Enstitüsü, Sakarya.
- Meyerhof, G. G. (1976). Bearing Capacity and Settlement of Pile Foundations. Journal of Geotech. Eng. Div., ASCE, 102, GT3.
- Bazaraa, A. R & Kurkur, M. M. (1986). N-values used to predict settlements of piles in Egypt. Proceedings of In Situ, 86, 462-474.
- Decourt, L. (1995). Prediction of load-settlement relationships for foundations on the basis of the SPT. Ciclo de Conferencias Internationale, Leonardo Zeevaert, UNAM, Mexico, 85-104.
- Tomlinson, M. J. (1994). Pile Design and Construction Practise Fourth Edition, E & FN Spon, an imprint of Chapman & Hall, 2–6 Boundary Row, London SE1 8HN, United Kingdom, London.
- O’Neill, M. W., & Reese, L. C. (1999). Drilled Shafts: Construction Procedures and Design Methods, Publication No. FHWA-IF-99-025. Federal Highway Administration, Washington, DC.
- Alku, Y. (2006). Kazık Yükleme Deneylerinin Değerlendirilmesi ile İlgili Bir Araştırma, Yüksek Lisans Tezi, İstanbul Teknik Üniversitesi, Fen Bilimleri Enstitüsü, İstanbul.
- Mansur, C., & Kaufman R. (1958). Mansur-Kaufman on Pile Tests. Transactions of the American Society of Civil Engineers, 123(1).
- Fuller, F. M., & Hoy, H. E. (1970). Pile Load Tests Including Quick Load Test Method Conventional Methods and Interpretations. Highway Research Record No.333, 78-89.
- Butler, H. D., & Hoy, H. E. (1977). Users Manual for the Texas Quick Load Method for Foundation Load Testing, FHWA, Office of Development, Washington, D.C., FHWA-IP-77-8, 59.