An Occupatıonal Safety Fuzzy Rısk Analysıs: an Applıcatıon in a Buıldıng Constructıon Sites
Öz
Anahtar Kelimeler
Kaynakça
- Gürcanli G. E., Müngen U.2009. An occupational safety risk analysis method at construction sites using fuzzy sets, International Journal of Industrial Ergonomics; 39:371–387.
- Morote A. N., Vila F. R. 2011. A fuzzy approach to construction project risk assessment. International Journal of Project Management; 29(2) 220- 231.
- .Liu J., Martínez L., Wang H., Rodríguez R. M., Novozhilov V. 2010. Computing with Words in Risk Assessment, International Journal of Computational Intelligence Systems;3(4) 396-419.
- Lin Y.H., Lin C.C., Tyan Y.Y. 2011. An Integrated Quantıtatıve Rısk Analysıs Method for Major Construction Accidents Using Fuzzy Concepts and Influence Diagram, Journal of Marine Science and Technology; 19 (4) 383-391.
- Shiliang S., Min J., Yong L., Runqiu L. 2012. Risk assessment on falling from height based on AHP-fuzzy, Procedia Engineering 45: 112 – 118.
- Zhou J.L., Hua B. Z., Sun Z.Y. 2013. Safety Assessment of High- Risk Operations in Hydroelectric-Project Based on Accidents Analysis, SEM, and ANP, Mathematical Problems in Engineering, Article ID 530198, 12 pages.
- Ardeshir A., Amiri M., Ghasemi Y., Errington M. 2014. Risk assessment of construction projects for water conveyance tunnels using fuzzy fault tree analysis, International Journal of Civil Engineering, Transaction A: Civil Engineering, 12 (4) 396- 412.
- Debnath, J., Biswas, A. Sivan, P., Sen K. N., Sahu S. 2016. Fuzzy inference model for assessing occupational risks in construction Sites; International Journal of Industrial Ergonomics 55, 114- 128.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
Orhan Engin
*
0000-0002-7250-0317
Türkiye
Raife Canlar Durmaz
Bu kişi benim
0000-0002-9518-1339
Türkiye
Yayımlanma Tarihi
29 Haziran 2023
Gönderilme Tarihi
1 Aralık 2022
Kabul Tarihi
6 Haziran 2023
Yayımlandığı Sayı
Yıl 2023 Cilt: 19 Sayı: 2