Gemi İnşaatında Simülasyon Ortamı Kullanarak Tekil Profil İmalatının İncelenmesi
Öz
Anahtar Kelimeler
Kaynakça
- Xu, J., Huang, E., Chen, C.H., Lee, L.H. Simulation Optimization: A Review and Exploration in the New Era of Cloud Computing and Big Data, Asia-Pacific Journal of Operational Research, Vol. 32, No. , p. 1-34. Kelton, D., Smith, J.S., Sturrock, D.T. Simio Modeling, Analysis, Applications, Sewickley November 30, p.3. Simulation: PA, E-book Ed., Song, Y.J., Lee, D.K., Woo, J.H., Shin, J.G. 2010. System Development and Applications of a Shipyard Layout
- Design Framework, Journal of Ship Production and Design, Vol. 26, No. , , p. 144-154. McLean, C., Shao, G. 2001. Simulation
- Operations, Proceedings of the Conference, Arlington, USA, p. 870- Simulation Shin, J.G., Lee, K.K., Woo, J.H., Kim, W.D., Lee, J.H., Kim, S.H., Park, J.Y., Yim, H. A. 2004. Modeling and Simulation of Production Process in Subassembly Lines at a Shipyard,
- Production, Vol. 20, No. 2, p. 79-83. of Ship Kim, H., Lee, S.S., Park, J.H., Lee, J.G. A Model for a Simulation-Based Shipbuilding System in a Shipyard Manufacturing International Journal of Computer Integrated Manufacturing, Vol. 18, No. 6, p. 427-441. Process, Lee, K., Shin, J.G., Ryu, C. 2009.
- Development of Simulation-Based Production Execution System in a Shipyard: A Case Study for a Panel Block Assembly Shop, Production Planning & Control, Vol. 20, No. 8, p. 768. Shin, J.G., Song, Y.J., Lee, D.K., Woo, A J.H. Framework for a Shipyard Layout Design Based on Simulation, Journal of Ship Production, Vol. 25, No. 3, p. 126-135. and Yasuhisa, O., Kentaro, H. 2005.
- Digital Manufacturing of Pipe Unit Assembly, Production, Vol. 21, No. 3, p. 141- of Ship Cheng, T.M., Feng, C.W. 2003. An
- Effective Simulation Mechanism for Construction Automation in Construction, Vol. 12, p. 227-244. Operations, Shin, J.G., Sohn, Simulation-Based Evaluation of Productivity For the Design of an Automated Fabrication Workshop in Shipbuilding, Journal of Ship Production, Vol. 16, No. 1, p. 46-59. Cha, J.H., Roh, M.I. 2010. Combined
- Discrete Event and Discrete Time Simulation Framework and Its Application to the Block Erection Process in Shipbuilding, Advances in Engineering Software, Vol. 41, p. 665. Woo, J.H., Song, Y.J., Kang, Y.W., Shin JG. 2010. Development of the Decision-Making System for the Ship Block Logistics Based on the Simulation,
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
-
Yazarlar
Murat Özkök
Bu kişi benim
Yayımlanma Tarihi
1 Ocak 2017
Gönderilme Tarihi
1 Ocak 2017
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2017 Cilt: 19 Sayı: 55