RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS

Cilt: 18 Sayı: 54 1 Eylül 2016
  • Aslan Deniz Karaoglan
PDF İndir
EN TR

EMEK YOĞUN ÇALIŞILAN PROJE TİPİ ÜRETİM SİSTEMLERİ İÇİN ARTIK TERİM TABANLI AKIŞ ZAMANI TAHMİN ALGORİTMASI

Öz

Regression-based methods are widely used for flow time estimation of customer orders. However, for the customer orders that will be produced for the first time in a labor intensive project type production system with new design parameters, it is hard to make thoroughly accurate flow time prediction at the quotation stage. This is caused by having so many uncontrollable factors in a production system, that are not placed in the mathematical models. These uncontrollable factors cause high differences between the observed and expected flow time. In this study, a new algorithm - that combines the regression analysis and the artificial neural networks - is proposed. By this way, the prediction performance of fitted regression model is improved and the lack-of-fit is decreased

Anahtar Kelimeler

Kaynakça

  1. Ragatz GL, Mabert VA. A Simulation Analysis of Due Date Assignment Rules, Journal of Operations Management, Cilt. 5, 1984, s. 27–39.
  2. Vig MM, Dooley KJ. Mixing Static and Dynamic Flow Time Estimates for Due-Date Assignment, Journal of Operations Management, Cilt. 11, 1993, s. 67–79.
  3. Arizono I, Yamamoto A, Ohta H. Scheduling for Minimizing Total Actual Flow Time by Neural Networks, International Journal of Production Research, Cilt. 30, 1992, s. 503–511.
  4. Enns ST. A Dynamic Forecasting Model for Job Shop Flowtime Prediction and Tardiness Control, International Journal of Production Research, Cilt. 33, No. 5, 1995, s. 1295–1312.
  5. Harris CR. Modelling the Impact of Design, Tactical, and Operational Factors on Manufacturing System Performance, International Journal of Production Research, Cilt. 35, No. 2, 1997, s. 479-499.
  6. Veral EA. Computer Simulation of Due-Date Setting in Multi-Machine Job Shops, Computers & Industrial Engineering, Cilt. 41, No. 1, 2001, s. 77-94.
  7. Govind N, Roeder TM. Estimating Expected Completion Times with Probabilistic Job Routing, Proceedings of the 2006 Winter Simulation Conference, Cilt. 1, No. 5, Winter Simulation Conference, Monterey, CA, Dec 03-06, 2006, s. 1804-1810.
  8. Li S, Li Y, Liu Y et al. A GA-Based NN Approach for Makespan Estimation, Applied Mathematics and Computation, Cilt. 185, No. 2, 2007, s. 1003-1014.

Ayrıntılar

Birincil Dil

Türkçe

Konular

-

Bölüm

-

Yazarlar

Aslan Deniz Karaoglan Bu kişi benim

Yayımlanma Tarihi

1 Eylül 2016

Gönderilme Tarihi

1 Eylül 2016

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2016 Cilt: 18 Sayı: 54

Kaynak Göster

APA
Karaoglan, A. D. (2016). RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, 18(54), 580-595. https://izlik.org/JA54XW74YM
AMA
1.Karaoglan AD. RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS. DEUFMD. 2016;18(54):580-595. https://izlik.org/JA54XW74YM
Chicago
Karaoglan, Aslan Deniz. 2016. “RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 18 (54): 580-95. https://izlik.org/JA54XW74YM.
EndNote
Karaoglan AD (01 Eylül 2016) RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 18 54 580–595.
IEEE
[1]A. D. Karaoglan, “RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS”, DEUFMD, c. 18, sy 54, ss. 580–595, Eyl. 2016, [çevrimiçi]. Erişim adresi: https://izlik.org/JA54XW74YM
ISNAD
Karaoglan, Aslan Deniz. “RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 18/54 (01 Eylül 2016): 580-595. https://izlik.org/JA54XW74YM.
JAMA
1.Karaoglan AD. RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS. DEUFMD. 2016;18:580–595.
MLA
Karaoglan, Aslan Deniz. “RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi, c. 18, sy 54, Eylül 2016, ss. 580-95, https://izlik.org/JA54XW74YM.
Vancouver
1.Aslan Deniz Karaoglan. RESIDUAL BASED FLOW TIME ESTIMATION ALGORITHM FOR LABOR INTENSIVE PROJECT TYPE PRODUCTION SYSTEMS. DEUFMD [Internet]. 01 Eylül 2016;18(54):580-95. Erişim adresi: https://izlik.org/JA54XW74YM

Bu dergi, Creative Commons Atıf-GayriTicari 4.0 Uluslararası Lisansı (CC BY-NC 4.0) altında lisanslanmıştır.

download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJmaWxlIiwicGF0aCI6IjliNTAvMDBjMi8xZmIxLzY5MjZmZDIyOGE1NzgyLjA3MzU5MTk2LnBuZyIsImV4cCI6MTc2NDE2OTE1Nywibm9uY2UiOiJhZDRmNjNlNzdhOWYwOWQ4YTNjNGVmNGIxOTFlZWViNyJ9.4Dxgc9mc-p4Tyti8NTU5pxEfGUWeuJud1fPWxu2mUy8