In this study, consumed electric energy with
values of influent and effluent water quality parameters and unit energy
consumption analysis of a wastewater treatment plant was made. COD, BOD5 and
TSS values in the raw wastewater and effluent along with unit based energy
consumption of Kocaeli Plajyolu Wastewater Treatment Plant were observed.
According to this data COD-Energy Consumption, BOD5-Energy Consumption and
TSS-Energy Consumption relations were set. 78% COD, 95% BOD5 and 90% TSS removal efficiencies
were observed during the observation period. According the calculated energy
consumption per pollutant removed values, from the observed parameters, show a
regular decrease.
Wastewater Treatment Plant Energy Consumption Wastewater removal efficiency Performance analysis
Bu çalışmada, kentsel atıksu artıma tesisinde tüketilen
elektrik enerjisi ile tesisin giriş ve çıkışında kirlilik parametrelerine
bakılarak, tesisin birim enerji tüketimi analizi yapılmıştır. Kocaeli Plajyolu
Kentsel Atıksu Arıtma Tesisi’nde tesisin giriş ve çıkışında bir aylık süre ile
KOI, BOI5, AKM değerleri ve enerji sarfiyatı ölçülmüştür. Bu veriler ile
kirlilik giderimine bağlı olarak tesisin KOI-Enerji, BOI5-Enerji, AKM-Enerji
ilişkileri incelenmiştir. Tesiste %78 KOI,
% 95 BOI5 ve % 90 AKM gideriminin sağlandığı tespit edilmiştir. Yapılan
hesaplamalara göre tesiste giderilen yük arttıkça birim enerji tüketiminin
azaldığı görülmüştür.
Atıksu Arıtma Tesisi Enerji Tüketimi Atıksu Giderim Verimi Performans Analizi
Birincil Dil | Türkçe |
---|---|
Konular | Mühendislik |
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 15 Aralık 2015 |
Yayımlandığı Sayı | Yıl 2015 Sayı: 035 |