Proactive Prevention Model to Manage Construction Time Delays in Developing Countries
Abstract
Keywords
Kaynakça
- [1] D. W. M. Chan and M. M. Kumaraswamy, “A comparative study of causes of time overruns in Hong Kong construction projects,” Int. J. Proj. Manag., vol. 15, no. 1, pp. 55–63, 1997, doi: 10.1016/S0263-7863(96)00039-7.
- [2] D. Arditi and T. Pattanakitchamroon, “Selecting a delay analysis method in resolving construction claims,” Int. J. Proj. Manag., vol. 24, no. 2, pp. 145–155, 2006, doi: 10.1016/j.ijproman.2005.08.005.
- [3] A. Kazaz, S. Ulubeyli, and N. A. Tuncbilekli, “Causes of delays in construction projects in Turkey,” J. Civ. Eng. Manag., vol. 18, no. 3, pp. 426–435, 2012, doi: 10.3846/13923730.2012.698913.
- [4] R. Radhi, R. Halim, and M. Jamal, “Exploring Building & Construction in Iraq,” 2021. [Online]. Available: https://kapita.iq/content/issue/building-and-construction-iraq.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Gökhan Kazar
*
0000-0002-8616-799X
Türkiye
Yayımlanma Tarihi
28 Haziran 2022
Gönderilme Tarihi
9 Mayıs 2022
Kabul Tarihi
7 Haziran 2022
Yayımlandığı Sayı
Yıl 2022 Cilt: 13 Sayı: 2
Cited By
Toward delay mitigation in Iraqi construction projects: Evaluating the causes and the implications
Ain Shams Engineering Journal
https://doi.org/10.1016/j.asej.2025.103598AI-powered delay risk prediction in construction projects: leveraging machine learning, deep learning and hybrid models
International Journal of Construction Management
https://doi.org/10.1080/15623599.2026.2619678