Proactive Prevention Model to Manage Construction Time Delays in Developing Countries

Cilt: 13 Sayı: 2 28 Haziran 2022
PDF İndir
TR EN

Proactive Prevention Model to Manage Construction Time Delays in Developing Countries

Abstract

Due to the complex structure of construction activities, schedule overruns are inevitable in the construction industry. Particularly, construction projects play a key role in the economic conditions of developing countries. Although several studies have mainly focused on the time delay factors in the construction projects, a study does not exist on providing reliable and applicable solutions based on the eye of expert view. Thus, this study attempts not only to identify the major delay factors but also to introduce a proactive prevention model including long-term strategies and immediate practical solutions to be implemented in the construction industry of developing countries. For this purpose, a survey was conducted with 140 experts in the construction sector of a developing country, Iraq. Importance Index (Imp. I) based on the frequency and severity value of each time delay attribute and Relative Importance Index (RII) for suggestions and proactive steps were calculated according to survey results. After identifying major causal factors, strategies, and practical implementations, we developed a proactive prevention model to be utilized in the construction industry. The proposed model includes different practical implementations for ongoing construction projects such as developing an Artificial Intelligence (AI)-based predictive model, using Time Series Analysis (TSA) approach, urgent practical applications, and long term strategies for construction companies to reduce time overruns in construction projects. To realize this kind of proactive prevention model in the construction industry, a data collection and sharing system including all related information recorded in diverse construction projects is highly recommended.

Keywords

Kaynakça

  1. [1] D. W. M. Chan and M. M. Kumaraswamy, “A comparative study of causes of time overruns in Hong Kong construction projects,” Int. J. Proj. Manag., vol. 15, no. 1, pp. 55–63, 1997, doi: 10.1016/S0263-7863(96)00039-7.
  2. [2] D. Arditi and T. Pattanakitchamroon, “Selecting a delay analysis method in resolving construction claims,” Int. J. Proj. Manag., vol. 24, no. 2, pp. 145–155, 2006, doi: 10.1016/j.ijproman.2005.08.005.
  3. [3] A. Kazaz, S. Ulubeyli, and N. A. Tuncbilekli, “Causes of delays in construction projects in Turkey,” J. Civ. Eng. Manag., vol. 18, no. 3, pp. 426–435, 2012, doi: 10.3846/13923730.2012.698913.
  4. [4] R. Radhi, R. Halim, and M. Jamal, “Exploring Building & Construction in Iraq,” 2021. [Online]. Available: https://kapita.iq/content/issue/building-and-construction-iraq.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

28 Haziran 2022

Gönderilme Tarihi

9 Mayıs 2022

Kabul Tarihi

7 Haziran 2022

Yayımlandığı Sayı

Yıl 2022 Cilt: 13 Sayı: 2

Kaynak Göster

IEEE
[1]I. S. M. Chenena ve G. Kazar, “Proactive Prevention Model to Manage Construction Time Delays in Developing Countries”, DÜMF MD, c. 13, sy 2, ss. 379–391, Haz. 2022, doi: 10.24012/dumf.1114399.

Cited By

DUJE tarafından yayınlanan tüm makaleler, Creative Commons Atıf 4.0 Uluslararası Lisansı ile lisanslanmıştır. Bu, orijinal eser ve kaynağın uygun şekilde belirtilmesi koşuluyla, herkesin eseri kopyalamasına, yeniden dağıtmasına, yeniden düzenlemesine, iletmesine ve uyarlamasına izin verir. 24456