ÜRETİM PROGRAMLAMA VE ÜRETİM PARTİ BÜYÜKLÜKLERİNİN TOPLAM HAZIRLIK ZAMANI ÜZERİNE ETKİSİ: BİR İŞLETME UYGULAMASI

Cilt: 9 Sayı: 1 1 Şubat 2009
  • Murat Kocamaz
PDF İndir
TR EN

ÜRETİM PROGRAMLAMA VE ÜRETİM PARTİ BÜYÜKLÜKLERİNİN TOPLAM HAZIRLIK ZAMANI ÜZERİNE ETKİSİ: BİR İŞLETME UYGULAMASI

Öz

Anahtar Kelimeler

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

-

Yazarlar

Murat Kocamaz Bu kişi benim

Yayımlanma Tarihi

1 Şubat 2009

Gönderilme Tarihi

1 Şubat 2009

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2009 Cilt: 9 Sayı: 1

Kaynak Göster

APA
Kocamaz, M. (2009). FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review, 9(1), 173-185. https://izlik.org/JA66FM27TJ
AMA
1.Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9(1):173-185. https://izlik.org/JA66FM27TJ
Chicago
Kocamaz, Murat. 2009. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9 (1): 173-85. https://izlik.org/JA66FM27TJ.
EndNote
Kocamaz M (01 Şubat 2009) FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review 9 1 173–185.
IEEE
[1]M. Kocamaz, “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”, eab, c. 9, sy 1, ss. 173–185, Şub. 2009, [çevrimiçi]. Erişim adresi: https://izlik.org/JA66FM27TJ
ISNAD
Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9/1 (01 Şubat 2009): 173-185. https://izlik.org/JA66FM27TJ.
JAMA
1.Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9:173–185.
MLA
Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review, c. 9, sy 1, Şubat 2009, ss. 173-85, https://izlik.org/JA66FM27TJ.
Vancouver
1.Murat Kocamaz. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab [Internet]. 01 Şubat 2009;9(1):173-85. Erişim adresi: https://izlik.org/JA66FM27TJ