| APA |
Kocamaz, M. (2009). FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review, 9(1), 173-185. https://izlik.org/JA66FM27TJ
|
|
| AMA |
1.Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9(1):173-185. https://izlik.org/JA66FM27TJ
|
|
| Chicago |
Kocamaz, Murat. 2009. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9 (1): 173-85. https://izlik.org/JA66FM27TJ.
|
|
| EndNote |
Kocamaz M (01 Şubat 2009) FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review 9 1 173–185.
|
|
| IEEE |
[1]M. Kocamaz, “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”, eab, c. 9, sy 1, ss. 173–185, Şub. 2009, [çevrimiçi]. Erişim adresi: https://izlik.org/JA66FM27TJ
|
|
| ISNAD |
Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9/1 (01 Şubat 2009): 173-185. https://izlik.org/JA66FM27TJ.
|
|
| JAMA |
1.Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9:173–185.
|
|
| MLA |
Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review, c. 9, sy 1, Şubat 2009, ss. 173-85, https://izlik.org/JA66FM27TJ.
|
|
| Vancouver |
1.Murat Kocamaz. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab [Internet]. 01 Şubat 2009;9(1):173-85. Erişim adresi: https://izlik.org/JA66FM27TJ
|
|