Bulanık Analitik Hiyerarşi Prosesi ile Fabrika İmalat Performansının Ölçümü
Öz
Anahtar Kelimeler
Kaynakça
- Abdel-Kader, M.G. ve Dugdale, D. (2001) “Evaluating Investments in Advanced Manufacturing Technology: A Fuzzy Set Theory Approach” British Accounting Review, 33 (4): 455-489.
- Agrell, P.J. ve West, B.M. (2001) “A Caveat on the Measurement of Productive Efficiency” International Journal of Production Economics, 69(1):1-14.
- Ahmad, M. ve Dhafr, N. (2002) “Establishing and Improving Manufacturing Performance Measures” Organizational Performance: An Empirical Investigation” Robotics and Computer-Integrated Manufacturing, 18(3- 4):171-176.
- Bamber, C.J., Castka, P., Sharp, J.M. ve Motara, Y. (2003) “Cross-Functional Team Working for Overall Equipment Effectiveness (OEE)” Journal of Quality in Maintenance Engineering, 9 (3):223-238.
- Bititci, U.S., Suwignjo, P. ve Carrie, A.S. (2001) “Strategy Management Through Quantitative Modelling of Performance Measurement Systems” International Journal of Production Economics, 69(1):15-22.
- Bozbura, F.T., Beskese, A. ve Kahraman, C. (2007) “Prioritization of Human Capital Measurement with Applications, 36 (1): 702-715. Indicators Using Fuzzy AHP” Expert Systems with Applications, 32(4):1100-1112.
- Buckley, J.J. (1985) “Fuzzy Hierarchical Analysis” Fuzy Sets and Systems, 17(3): 233-247.
- Çakır, O. ve Canbolat, M.S. (2008) “A Web-Based Decision Support System for Multi-Criteria Inventory Classification Using Fuzzy AHP Methodology” Expert Systems with Applications, 35(3):1367-1378.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yazarlar
Gökhan Akyüz
Bu kişi benim
Yayımlanma Tarihi
1 Temmuz 2012
Gönderilme Tarihi
1 Temmuz 2012
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2012 Cilt: 12 Sayı: 3