Spare Parts Distribution Planning and An Application
Öz
Anahtar Kelimeler
Kaynakça
- Badri, M. A., (1999) “ Combining The Analytic Hierarchy Process And Goal Programming For Global Facility Location-allocation Problem” International Journal of Production Economics, 62(3), 237-248.
- Blin J.M., (1974) “Fuzzy Relations In Group Deci- sion Theory” Journal of Cybernetics, 4, 17-22.
- Chen, C. T. (2001) “A Fuzzy Approach To Select The Location Of The Distribution Center” Fuzzy Sets and Systems, 118(1), 65-73.
- Kahraman, C., Ruan, D., Doğan, I. (2003) “Fuzzy Group Decision-making For Facility Location Selection” Information Sciences, 157, 135-153.
- Liu, S., Chan, F. T., & Chung, S. H. (2011) “A Study Of Distribution Center Location Based On The Rough Sets And Interactive Multi-objective Fuzzy Decision The- ory” Robotics and Computer-Integrated Manufacturing, 27(2), 426-433.
- Nagurney, A. (2006) “Supply Chain Network Econom- ics: Dynamics of Prices, Flows And Profits” Edward Elgar Publishing, Cheltenham UK, 1-84542-916-8.
- Öncel, U., Çebi, F., & Çelebi, D. (2011) “Bir Oto- motiv Yedek Parça Firması İçin Yeni Bir Dağıtım Merkezi Kurulum Kararı”, http://acikerisim.ticaret.edu.tr:8080/ xmlui/handle/11467/558, (22.08.2016).
- Özgen, D., Gülsün, B. (2014) “Combining Possi- bilistic Linear Programming And Fuzzy AHP For Solving The Multi-objective Capacitated Multi-facility Location Problem” Information Sciences, 268, 185-201.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yazarlar
Aycan Kaya
Bu kişi benim
Cem Yıldır
Bu kişi benim
İbrahim Ağıralan
Bu kişi benim
Ferhan Çebi
Bu kişi benim
Yayımlanma Tarihi
1 Kasım 2016
Gönderilme Tarihi
1 Kasım 2016
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2016 Cilt: 16 Sayı: 5