BibTex RIS Kaynak Göster

ÜRETİM PROGRAMLAMA VE ÜRETİM PARTİ BÜYÜKLÜKLERİNİN TOPLAM HAZIRLIK ZAMANI ÜZERİNE ETKİSİ: BİR İŞLETME UYGULAMASI

Yıl 2009, Cilt: 9 Sayı: 1, 173 - 185, 01.02.2009

FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION

Yıl 2009, Cilt: 9 Sayı: 1, 173 - 185, 01.02.2009
Toplam 0 adet kaynakça vardır.

Ayrıntılar

Diğer ID JA52UC35BG
Bölüm Araştırma Makalesi
Yazarlar

Murat Kocamaz Bu kişi benim

Yayımlanma Tarihi 1 Şubat 2009
Yayımlandığı Sayı Yıl 2009 Cilt: 9 Sayı: 1

Kaynak Göster

APA Kocamaz, M. (2009). FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review, 9(1), 173-185.
AMA Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. Şubat 2009;9(1):173-185.
Chicago Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9, sy. 1 (Şubat 2009): 173-85.
EndNote Kocamaz M (01 Şubat 2009) FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. Ege Academic Review 9 1 173–185.
IEEE M. Kocamaz, “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”, eab, c. 9, sy. 1, ss. 173–185, 2009.
ISNAD Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review 9/1 (Şubat 2009), 173-185.
JAMA Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9:173–185.
MLA Kocamaz, Murat. “FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION”. Ege Academic Review, c. 9, sy. 1, 2009, ss. 173-85.
Vancouver Kocamaz M. FFECTS OF PRODUCTION PLANNING AND PRODUCTION LOT SIZING OVER TOTAL SETUP TIME: A BUSINESS APPLICATION. eab. 2009;9(1):173-85.