Risk Management of Software Development Project: An Example of A Bank ATM Project
Öz
In this study, risk management subject, which is one of important components of project management was studied. Firstly, analyzing, defining, planning and evaluation step of risks and then, observation and control that are necessary for the counterplan in the project management were examined. There is a need of certain decision mechanism and management policies, which are not biased on human in order to achieve these steps. For this purpose, a software development project that is required in the ATM was chosen as example. Determination of risk factors and their preventing policies were illustrated in a bank ATM software example
Anahtar Kelimeler
Kaynakça
- Anantatmula, V. ve Fan, Y. (2013) “Risk Manage- ment Instruments, Strategies and Their Impact on Pro- ject Success” International Journal of Risk and Contingency Management 2(2): 27-41.
- Bannerman, P.L. (2008) “Risk and Risk Management in Software Projects: A Reassessment” Journal of Systems and Software, 81(12):2118–2133.
- Barry, W.B. (1991) “Software Risk Management: Principles And Practices” Software, IEEE , 8(1):32-41.
- Barry W.B. ve DeMarco, T. (1997) “The Atlantic Systems Guild, Software Risk, Management” IEEE Soft- ware, 17-19.
- Ceylan, H. ve Başhelvacı, V.S. (2011) “Risk Değer- lendirme Tablosu Yöntemi ile Risk Analizi: Bir Uygula- ma” International Journal of Engineering Research and De- velopment, 3(2): 25-33.
- Dikmen, I., Birgonul, M.T., Anac, C., Tah, J.H.M. ve Aouad, G. (2008) “Learning From Risks, A Tool For Post-Project Risk Assessment” Automation in Constructi- on, 18(1):42-50.
- Drucker, P.F. (1996) Yönetim Uygulaması, İstanbul, İnkilap Kitabevi.
- Emhan, A. (2009) “Risk Yönetim Süreci Ve Risk Yö- netmekte Kullanılan Teknikler” Atatürk Üniversitesi İkti- sadi ve İdari Bilimler Dergisi, 23(3):209-220.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yayımlanma Tarihi
1 Şubat 2015
Gönderilme Tarihi
1 Şubat 2015
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2015 Cilt: 15 Sayı: 1
APA
Yazgan, H. R., & Sönmez, P. (2015). Risk Management of Software Development Project: An Example of A Bank ATM Project. Ege Academic Review, 15(1), 111-126. https://izlik.org/JA59SB88JC
AMA
1.Yazgan HR, Sönmez P. Risk Management of Software Development Project: An Example of A Bank ATM Project. eab. 2015;15(1):111-126. https://izlik.org/JA59SB88JC
Chicago
Yazgan, Harun Reşit, ve Pınar Sönmez. 2015. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review 15 (1): 111-26. https://izlik.org/JA59SB88JC.
EndNote
Yazgan HR, Sönmez P (01 Şubat 2015) Risk Management of Software Development Project: An Example of A Bank ATM Project. Ege Academic Review 15 1 111–126.
IEEE
[1]H. R. Yazgan ve P. Sönmez, “Risk Management of Software Development Project: An Example of A Bank ATM Project”, eab, c. 15, sy 1, ss. 111–126, Şub. 2015, [çevrimiçi]. Erişim adresi: https://izlik.org/JA59SB88JC
ISNAD
Yazgan, Harun Reşit - Sönmez, Pınar. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review 15/1 (01 Şubat 2015): 111-126. https://izlik.org/JA59SB88JC.
JAMA
1.Yazgan HR, Sönmez P. Risk Management of Software Development Project: An Example of A Bank ATM Project. eab. 2015;15:111–126.
MLA
Yazgan, Harun Reşit, ve Pınar Sönmez. “Risk Management of Software Development Project: An Example of A Bank ATM Project”. Ege Academic Review, c. 15, sy 1, Şubat 2015, ss. 111-26, https://izlik.org/JA59SB88JC.
Vancouver
1.Harun Reşit Yazgan, Pınar Sönmez. Risk Management of Software Development Project: An Example of A Bank ATM Project. eab [Internet]. 01 Şubat 2015;15(1):111-26. Erişim adresi: https://izlik.org/JA59SB88JC