Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects

Sayı: 23 30 Nisan 2021
PDF İndir
TR EN

Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects

Öz

In construction projects, delays are common problems often encountered with possible vital financial effects on the overall construction industry. In an effort to uncover the main attributes characterizing construction delays, this integrated study proposed a comprehensive framework dealing with both causes and the effects of delays. In addition to providing a detailed analysis of the delay causes according to frequency of occurrence and degree of severity, this comprehensive study also differentiated among approaches of clients, contractors and consultants as well. The findings revealed that clients, contractors and consultants have remarkably different approaches regarding delay causes considering both the frequency of occurrence and degree of severity. Although numerous delay causes that are apparently under the responsibility of different parties exist, this study revealed that each party is holding the others responsible for the causes of delays. Hence, it may not be possible for any of the three specified major parties to solve this problem separately and the findings suggest that an effective coordination and communication network should exist among all three of these parties throughout the whole project. The clients, consultants and the contractors in the relevant sectors will be able to use the framework provided within this research to recognize the approaches of other parties in a more detailed and accurate manner, to identify the areas to focus for effective coordination, to improve performance and to minimize both the causes and the effects of delays.

Anahtar Kelimeler

Kaynakça

  1. Alaghbari, W., Kadir, M. R. A., & Ernavati, A.S. (2007). The significant factors Causing Delay of Building Construction Projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206. https://doi.org/10.1108/09699980710731308
  2. Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58, 801-808. https://doi.org/10.1016/j.aej.2019.07.002
  3. Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 35, 136-147. https://doi.org/10.1016/j.ijproman.2016.10.01
  4. Assaf, S. A., & Al-Hejji, S. (2006). Causes of Delay in Large Construction Projects. International Journal of Project Management,24(4),349-357. https://doi.org/10.1016/j.ijproman.2005.11.010
  5. Aziz, R. F., & Abdel-Hakam A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria EngineeringJournal, 55(2), 1515-1539. https://doi.org/10.1016/j.aej.2016.03.006
  6. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indıan construction projects. International Journal of Project Management, 30,479-489. https://doi.org/10.1016/j.ijproman.2011.10.004
  7. Enshassi, A., Arain, F., & Al-Raee, S. (2010). Causes of variation orders is construction projects in the Gaza Strip. Journal of Civil Engineering and Management, 16(4), 540-551. https://doi.org/10.3846/jcem.2010.60
  8. Gluszak, M., & Lesniak, A. (2015). Construction delays in clients opinion – multivariate statistical analysis. Procedia Engineering, 123, 182-189. https://doi.org/10.1016/j.proeng.2015.10.075

Ayrıntılar

Birincil Dil

İngilizce

Konular

Mühendislik

Bölüm

Araştırma Makalesi

Yazarlar

Mehmedali Egemen *
0000-0003-1186-1968
Kuzey Kıbrıs Türk Cumhuriyeti

Yayımlanma Tarihi

30 Nisan 2021

Gönderilme Tarihi

29 Ocak 2021

Kabul Tarihi

28 Mart 2021

Yayımlandığı Sayı

Yıl 2021 Sayı: 23

Kaynak Göster

APA
Egemen, M. (2021). Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects. Avrupa Bilim ve Teknoloji Dergisi, 23, 312-321. https://doi.org/10.31590/ejosat.870763
AMA
1.Egemen M. Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects. EJOSAT. 2021;(23):312-321. doi:10.31590/ejosat.870763
Chicago
Egemen, Mehmedali. 2021. “Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects”. Avrupa Bilim ve Teknoloji Dergisi, sy 23: 312-21. https://doi.org/10.31590/ejosat.870763.
EndNote
Egemen M (01 Nisan 2021) Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects. Avrupa Bilim ve Teknoloji Dergisi 23 312–321.
IEEE
[1]M. Egemen, “Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects”, EJOSAT, sy 23, ss. 312–321, Nis. 2021, doi: 10.31590/ejosat.870763.
ISNAD
Egemen, Mehmedali. “Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects”. Avrupa Bilim ve Teknoloji Dergisi. 23 (01 Nisan 2021): 312-321. https://doi.org/10.31590/ejosat.870763.
JAMA
1.Egemen M. Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects. EJOSAT. 2021;:312–321.
MLA
Egemen, Mehmedali. “Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects”. Avrupa Bilim ve Teknoloji Dergisi, sy 23, Nisan 2021, ss. 312-21, doi:10.31590/ejosat.870763.
Vancouver
1.Mehmedali Egemen. Approaches of Clients, Consultants and Contractors to Causes of Delays in Construction Projects. EJOSAT. 01 Nisan 2021;(23):312-21. doi:10.31590/ejosat.870763