Determination of Generator Profits in Day-Ahead Electricity Market Under the Effect of Capacity Withholding by Agent-Based Modelling
Öz
Anahtar Kelimeler
Kaynakça
- [1] Nicolaisen, J., Petrov, V., & Tesfatsion, L. (2002). Market power and efficiency in a computational electricity market with discriminatory double-auction pricing. IEEE Transactions on Evolutionary Computation, 5(5), 504–523.
- [2] Tellidou, A. C., & Bakirtzis, A. G. (2007). Agent-based analysis of capacity withholding and tacit collusion in electricity markets. IEEE Transactions on Power Systems, 22(4), 1735–1742.
- [3] Li, H., & Tesfatsion, L. (2009, July). The AMES wholesale power market test bed: A computational laboratory for research, teaching, and training. In 2009 IEEE Power & Energy Society General Meeting (pp. 1–8). IEEE.
- [4] Li, H., Sun, J., & Tesfatsion, L. (2008, July). Dynamic LMP response under alternative price-cap and price-sensitive demand scenarios. In 2008 IEEE Power and Energy Society General Meeting—Conversion and Delivery of Electrical Energy in the 21st Century (pp. 1–8). IEEE.
- [5] Li, H., & Tesfatsion, L. (2009, March). Capacity withholding in restructured wholesale power markets: An agent-based test bed study. In 2009 IEEE/PES Power Systems Conference and Exposition (pp. 1–11). IEEE.
- [6] Li, H., & Tesfatsion, L. (2010). ISO net surplus collection and allocation in wholesale power markets under LMP. IEEE Transactions on Power Systems, 26(2), 627–641.
- [7] Tesfatsion, L. (n.d.). AMES Wholesale Power Market Test Bed Homepage. Economics Department, Iowa State University. Retrieved March 20, 2021, from http://www.econ.iastate.edu/tesfatsi/AMESMarketHome.htm.
- [8] Li, H., & Tesfatsion, L. (2012). Co-learning patterns as emergent market phenomena: An electricity market illustration. Journal of Economic Behavior & Organization, 82(2–3), 395–419.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Elektrik Tesisleri
Bölüm
Araştırma Makalesi
Yazarlar
Canan Karatekin
0000-0003-1241-3956
Türkiye
Yayımlanma Tarihi
31 Ağustos 2026
Gönderilme Tarihi
3 Haziran 2025
Kabul Tarihi
1 Haziran 2026
Yayımlandığı Sayı
Yıl 2026 Cilt: 19 Sayı: 2