Araştırma Makalesi

Examination of Lane Capacity at Fully Actuated Intersections

Cilt: 4 Sayı: 1 18 Şubat 2025
PDF İndir
TR EN

Examination of Lane Capacity at Fully Actuated Intersections

Öz

This study investigates factors influencing lane capacity at a fully actuated intersection in Mersin.This study examines the factors affecting lane capacity at an intersection in Mersin managed by a fully actuated signal control system. Capacity management provides significant advantages by reducing delays in traffic flow and alleviating traffic congestion. This can contribute to environmental sustainability goals such as reducing emissions and improving urban air quality. The study thoroughly investigates the impact of factors such as queue length, the percentage of heavy vehicles, and discharge flow rate on lane capacity. The Weighted Least Squares (WLS) technique was used for the analysis, allowing for the statistical evaluation of the data and verification of the results. The key findings of the study are as follows: The presence of heavy vehicles reduces lane capacity. An increase in queue length leads to an increase in lane capacity. There is a tendency for lane capacity to increase with a higher discharge flow rate. These findings provide important insights for decision-makers looking to develop urban transportation strategies. It is important to take such analyses and results into consideration, especially in traffic management and the creation of sustainable transportation policies.

Anahtar Kelimeler

Destekleyen Kurum

This article is not supported by any institution.

Etik Beyan

“There is no need for an ethics committee approval in the prepared article” “There is no conflict of interest with any person/institution in the prepared article”

Teşekkür

The authors extend their appreciation to the Transportation Department of the Mersin Metropolitan Municipality for graciously supplying the real-time video recordings and signal system data require for this study.

Kaynakça

  1. A. E. Kitali, and P. T. Sando, “A full Bayesian approach to appraise the safety effects of pedestrian countdown signals to drivers,” Accid. Anal. Prev., vol. 106, pp. 327-335.
  2. S. Mokhtarimousavi, J. C. Anderson, A. Azizinamini, and M. Hadi, “Factors affecting injury severity in vehicle-pedestrian crashes: a day-of-week analysis using random parameter ordered response models and artificial neural networks,” Int. J. Transp. Sci. Technol., vol. 9, no. 2, pp. 100-115, Jun. 2020.
  3. M. Hadi, M. S. Iqbal, T. Wang, Y. Xiao, M. Arafat, and S. Afreen, “Connected vehicle vehicle-to-infrastructure support of active traffic management,” May 2019. (Dergi ismi belirtilmedi, eksik olabilir.)
  4. Y. J. Gong, and J. Zhang, “Real-time traffic signal control for modern roundabouts by using particle swarm optimization-based fuzzy controller,” arXiv:1408.0689, 2014.
  5. A. H. Alomari and T. I. Alhadidi, “A Stochastic Approach for Modeling the Saturation Flow Rate at Traffic Signals in Jordan,” Iran. J. Sci. Technol., vol. 1–12, Apr. 2024.
  6. S. El-Tantawy, B. Abdulhai, and H. Abdelgawad, “Multiagent reinforcement learning for integrated network of adaptive traffic signal controllers (MARLIN-ATSC): Methodology and large-scale application on downtown Toronto,” IEEE Trans. Intell. Transp. Syst., vol. 14, no. 3, pp. 1140-1150, Sep. 2013.
  7. S. M. Chin, O. Franzese, D. L. Greene, H. L. Hwang, and R. Gibson, “Temporary losses of highway capacity and impacts on performance: Phase 2.” (Dergi ismi belirtilmemiş, eksik olabilir.)
  8. M. I. Ashqer, H. I. Ashqar, M. Elhenawy, M. Almanaa, M. A. Aljimal, H. A. Rakha, and M. Bikdash, “Evaluating a signalized intersection performance using unmanned aerial data,” Transp. Lett., vol. 16, no. 5, pp. 452-460, Apr. 2024.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Ulaştırma Mühendisliği

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

18 Şubat 2025

Gönderilme Tarihi

9 Mart 2024

Kabul Tarihi

11 Kasım 2024

Yayımlandığı Sayı

Yıl 2025 Cilt: 4 Sayı: 1

Kaynak Göster

APA
Karabulut, N. C., Özen, M., & Altıntaşı, O. (2025). Examination of Lane Capacity at Fully Actuated Intersections. Firat University Journal of Experimental and Computational Engineering, 4(1), 182-191. https://doi.org/10.62520/fujece.1449990
AMA
1.Karabulut NC, Özen M, Altıntaşı O. Examination of Lane Capacity at Fully Actuated Intersections. Firat University Journal of Experimental and Computational Engineering. 2025;4(1):182-191. doi:10.62520/fujece.1449990
Chicago
Karabulut, Nihat Can, Murat Özen, ve Oruç Altıntaşı. 2025. “Examination of Lane Capacity at Fully Actuated Intersections”. Firat University Journal of Experimental and Computational Engineering 4 (1): 182-91. https://doi.org/10.62520/fujece.1449990.
EndNote
Karabulut NC, Özen M, Altıntaşı O (01 Şubat 2025) Examination of Lane Capacity at Fully Actuated Intersections. Firat University Journal of Experimental and Computational Engineering 4 1 182–191.
IEEE
[1]N. C. Karabulut, M. Özen, ve O. Altıntaşı, “Examination of Lane Capacity at Fully Actuated Intersections”, Firat University Journal of Experimental and Computational Engineering, c. 4, sy 1, ss. 182–191, Şub. 2025, doi: 10.62520/fujece.1449990.
ISNAD
Karabulut, Nihat Can - Özen, Murat - Altıntaşı, Oruç. “Examination of Lane Capacity at Fully Actuated Intersections”. Firat University Journal of Experimental and Computational Engineering 4/1 (01 Şubat 2025): 182-191. https://doi.org/10.62520/fujece.1449990.
JAMA
1.Karabulut NC, Özen M, Altıntaşı O. Examination of Lane Capacity at Fully Actuated Intersections. Firat University Journal of Experimental and Computational Engineering. 2025;4:182–191.
MLA
Karabulut, Nihat Can, vd. “Examination of Lane Capacity at Fully Actuated Intersections”. Firat University Journal of Experimental and Computational Engineering, c. 4, sy 1, Şubat 2025, ss. 182-91, doi:10.62520/fujece.1449990.
Vancouver
1.Nihat Can Karabulut, Murat Özen, Oruç Altıntaşı. Examination of Lane Capacity at Fully Actuated Intersections. Firat University Journal of Experimental and Computational Engineering. 01 Şubat 2025;4(1):182-91. doi:10.62520/fujece.1449990