Sıra bağımlı hazırlık süreli özdeş paralel makine çizelgeleme problemi için yeni çözüm gösterimleri
Öz
Anahtar Kelimeler
Kaynakça
- [1] Allahverdi A., Gupta J., Aldowaisan T., A review of scheduling involving setup considerations, Omega The International Journal of Management Science, 27, 219-239, 1999.
- [2] Xi Y., Jang J., Scheduling jobs on identical parallel machines with unequal future ready time and sequence dependent setup: An experimental study, International Journal of Production Economics, 137(1), 1-10, 2012.
- [3] Yang W.H, Liao C.J., Survey of scheduling research involving setup times, International Journal of Systems Science, 30, 143-155, 1999.
- [4] Lee Y., Pinedo M., Scheduling Jobs on Parallel Machines with Sequence Dependent Setup Times, European Journal of Operational Research, 100(3), 464-474, 1997.
- [5] Min L., Cheng W., A genetic algorithm for minimizing the makespan in the case of scheduling identical parallel machines, Artificial Intelligence in Engineering, 13(4), 399-403, 1999.
- [6] Tahar D.N., Yalaoui F., Chu C., Amodeo L., A Linear Programming Approach for Identical Parallel Machine Scheduling with job Splitting and Sequence-Dependent Setup Times, International Journal of Production Economics, 99 (1), 63–73, 2006.
- [7] Lee W.C., Wu C.C., Chen P., A Simulated Annealing Approach to Makespan Minimization on Identical Parallel Machines, The International Journal of Advanced Manufacturing Technology, 31(3-4), 328–334, 2006.
- [8] Biskup D., Herrmann J., Gupta J.N.D., Scheduling Identical Parallel Machines to Minimize Total Tardiness, International Journal of Production Economics, 115(1), 134–142, 2008.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
Arda Takan
Bu kişi benim
0000-0002-9452-781X
Türkiye
Tuğba Saraç
*
0000-0002-8115-3206
Türkiye
Yayımlanma Tarihi
7 Ekim 2022
Gönderilme Tarihi
1 Kasım 2020
Kabul Tarihi
10 Mayıs 2022
Yayımlandığı Sayı
Yıl 2023 Cilt: 38 Sayı: 2