Risk Factors Identification and Estimation for Glass Fiber Reinforced Concrete Production Sector
Öz
Glass fiber reinforced concrete (GRC) usage in construction industry has been becoming very popular due to its aesthetic, mechanical properties, fast and reliable production in the last decade. However, it has more complex manufacturing processes compared with the other types of concrete pouring systems. Hence, it needs to make higher investments for its more detailed production line. Higher investments carry along more and several types of risk factors, and it becomes necessary to manage them. This paper describes the actual identification of possible risk factors in glass fiber reinforced concrete production sector. And it aims to decrease the unforeseen increase in cost and delays in this branch of concrete production and it is considered to affiliate value for owners, contractors, and the environments in the sector.
Anahtar Kelimeler
Kaynakça
- [1] M. S. B. A. A. El-Karim, O. A. M. E. N., A. M. Abdel-Alim. Identification and assessment of risk factors affecting construction projects, HBRC Journal, Housing and Building National Research Center, 2015, Article in Press.
- [2] ANSI/PMI 99-001-2004: A Guide to the Project Management Body of Knowledge, Third Edition.
- [3] Cooper, D. F. (2005). Project risk management guidelines: Managing risk in large projects and complex procurements. John Wiley & Sons, Inc.
- [4] Bernstein, P. L., & Bernstein, P. L. (1996). Against the gods: The remarkable story of risk (pp. 1269-1275). New York: Wiley.
- [5] Aven, T. (2016). Risk assessment and risk management: Review of recent advances on their foundation. European Journal of Operational Research, 253(1), 1-13.
- [6] Tian Y., (2008) Compiling principle and method of railway and highway engineering budget, Beijing: China railway press.
- [7] Jin D., (2004) The study of the system theory and integration of life-cycle engineering project risk management, Tianjin: Tianjin University.
- [8] Wang L., Li Y., Wang E. Research on Risk Management of Railway Engineering Construction. Systems Engineering Procedia 1 (2011) 174–180.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
Sadık Alper Yıldızel
KARAMANOĞLU MEHMETBEY ÜNİVERSİTESİ
Türkiye
Yusuf Arslan
DÜZCE ÜNİVERSİTESİ
Türkiye
Yayımlanma Tarihi
22 Aralık 2017
Gönderilme Tarihi
23 Ekim 2017
Kabul Tarihi
21 Aralık 2017
Yayımlandığı Sayı
Yıl 2017 Cilt: 5 Sayı: 4
Cited By
Laboratuvar Güvenilirlik Analizinde SPAR-H Yaklaşımı: Toprak Azot Analizi Örneği
Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji
https://doi.org/10.29109/gujsc.1625155