Yüksek doğrulukta kaba inşaat kalemlerinin metrajını hesaplayan YBM tabanlı prototip yazılımın geliştirilmesi
Öz
Anahtar Kelimeler
3B görselleştirme , Metraj , Python , Tkinter , YBM
Kaynakça
- Albahbah, M., Kıvrak, S., & Arslan, G. (2021). Application areas of augmented reality and virtual reality in construction project management: A scoping review. Journal of Construction Engineering Management & Innovation, 4(3), 151-172, https://doi.org/10.31462/jcemi.2021.03151172.
- Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM—a case study approach. Automation in construction, 24, 149-159.
- Bayram, S. (2020). Yapı bilgi modellemesi (YBM) kapsamında geleneksel metraj ile yazılımın karşılaştırılması, Yapı Bilgi modelleme, 2(2), 58-65.
- Bettemir, Ö. H. (2018). Development of spreadsheet based quantity take-off and cost estimation application. Journal of Construction Engineering Management & Innovation, 1(3), 108-117, https://doi.org/10.31462/jcemi.2018.03108117.
- Bettemir, Ö.H., Gündüz, E., Akkurt, O., Hilal, E., & Arslan, M.A. (2019). İnşaat işlerinin iş programına bağlı nakit akışı değişkenliğinin saptanması ve düzenlenmesi. Mühendislik Bilimleri ve Tasarım Dergisi, 7(1), 211-223, https://doi.org/10.21923/jesd.459948.
- Bettemir, Ö.H, & Yücel, T. (2021) Zaman maliyet ödünleşim probleminin en az insan müdahalesi ile oluşturulup çözülmesi. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi, 26(2), 461-480, https://doi.org/10.17482/uumfd.869234.
- Bettemir, Ö.H, & Bulak, Ö. (2022). İnşaat sürecinin iş çizelgelemesi, yönetimi ve optimizasyonu. Teknik Dergi, 33(6), 12945-12986, https://doi.org/10.18400/tekderg.981601.
- Bettemir, Ö. H., Özdemir, E., & Sarıcı, D. E. (2021). Selection of construction machine by considering time-cost trade-off problem. Journal of Construction Engineering Management & Innovation, 4(3), 173-186, https://doi.org/10.31462/jcemi.2021.03173186.
- Choi J., Kim H. & Kim I. (2015). Open BIM-based quantity take-off system for schematic estimation of building frame in early design stage. Journal of Computational Design and Engineering, 2(1):16-25, https://doi.org/10.1016/j.jcde.2014.11.002.
- Delgado J.M.D., Oyedele L., Demian P., & Beach T. (2020). A research agenda for augmented and virtual reality in architecture, engineering and construction. Advanced Engineering Informatics, 45, 101-122. https://doi.org/10.1016/j.aei.2020.101122.