Araştırma Makalesi

A Fuzzy Approach to Bi-Objective Newsboy Problem

Cilt: 3 Sayı: 2 28 Ekim 2018
PDF İndir
EN TR

A Fuzzy Approach to Bi-Objective Newsboy Problem

Öz

The single period stochastic inventory problem is referred to as ”Newsboy” or ”Newsvendor” problem in the literature, and can be expressed as determining optimal order quantities under stochastic demand. Due to single order opportunity, the order quantity should be determined for the entire period. Most studies use the expected profit as the performance measure in the solution of the Newsboy problem. However, managers and decision makers may be more concerned with a probability level to achieve a specific target profit as another performance measure beside the expected profit. These two performance measures conflict with each other, and cannot be optimized simultaneously. Therefore, a Fuzzy Bi-Objective Programming model has been developed to find a good compromise solution to the problem. Two cases have been presented to show use of the proposed model under uniform and exponential demand.

Anahtar Kelimeler

Kaynakça

  1. [1] B. Aytac and S. D. Wu, "Characterization of demand for short life-cycle technology products," Annals of Operations Research, vol. 203, pp. 255-277, 2013.
  2. [2] S. Jahanbin, P. Goodwin, and S. Meeran, "New Product Sales Forecasting in the Mobile Phone Industry: an evaluation of current methods," International Institute of Forecasters,. 2013.
  3. [3] M. Khouja, "The single-period (news-vendor) problem:literature review and suggestions for future research," Omega, vol. 27, pp. 537-553, 1999.
  4. [4] G. Gallego and I. Moon, "The distribution free newsboy problem: review and extensions," Journal of the Operational Research Society, pp. 825-834, 1993.
  5. [5] L. R. Weatherford and P. E. Pfeifer, "The economic value of using advance booking of orders," Omega, vol. 22, pp. 105-111, 1994.
  6. [6] I. W. Kabak and A. I. Schiff, "Inventory models and management objectives," Sloan Management Review, vol. 19, pp. 53, 1978.
  7. [7] W. Shih, "A general decision model for cost-volume-profit analysis under uncertainty," Accounting Review, vol. 31, pp. 687-706, 1979.
  8. [8] B. E. Ismail and J. G. Louderback, "Optimizing and satisficing in stochastic cost-volume-profit analysis," Decision Sciences, vol. 10, pp. 205-217, 1979.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

28 Ekim 2018

Gönderilme Tarihi

27 Ağustos 2018

Kabul Tarihi

25 Ekim 2018

Yayımlandığı Sayı

Yıl 2018 Cilt: 3 Sayı: 2

Kaynak Göster

APA
Öğütlü, A., & Hasgül, S. (2018). A Fuzzy Approach to Bi-Objective Newsboy Problem. Harran Üniversitesi Mühendislik Dergisi, 3(2), 35-42. https://izlik.org/JA47ES28ZN
AMA
1.Öğütlü A, Hasgül S. A Fuzzy Approach to Bi-Objective Newsboy Problem. HUMDER. 2018;3(2):35-42. https://izlik.org/JA47ES28ZN
Chicago
Öğütlü, Ahmet, ve Servet Hasgül. 2018. “A Fuzzy Approach to Bi-Objective Newsboy Problem”. Harran Üniversitesi Mühendislik Dergisi 3 (2): 35-42. https://izlik.org/JA47ES28ZN.
EndNote
Öğütlü A, Hasgül S (01 Ekim 2018) A Fuzzy Approach to Bi-Objective Newsboy Problem. Harran Üniversitesi Mühendislik Dergisi 3 2 35–42.
IEEE
[1]A. Öğütlü ve S. Hasgül, “A Fuzzy Approach to Bi-Objective Newsboy Problem”, HUMDER, c. 3, sy 2, ss. 35–42, Eki. 2018, [çevrimiçi]. Erişim adresi: https://izlik.org/JA47ES28ZN
ISNAD
Öğütlü, Ahmet - Hasgül, Servet. “A Fuzzy Approach to Bi-Objective Newsboy Problem”. Harran Üniversitesi Mühendislik Dergisi 3/2 (01 Ekim 2018): 35-42. https://izlik.org/JA47ES28ZN.
JAMA
1.Öğütlü A, Hasgül S. A Fuzzy Approach to Bi-Objective Newsboy Problem. HUMDER. 2018;3:35–42.
MLA
Öğütlü, Ahmet, ve Servet Hasgül. “A Fuzzy Approach to Bi-Objective Newsboy Problem”. Harran Üniversitesi Mühendislik Dergisi, c. 3, sy 2, Ekim 2018, ss. 35-42, https://izlik.org/JA47ES28ZN.
Vancouver
1.Ahmet Öğütlü, Servet Hasgül. A Fuzzy Approach to Bi-Objective Newsboy Problem. HUMDER [Internet]. 01 Ekim 2018;3(2):35-42. Erişim adresi: https://izlik.org/JA47ES28ZN