Araştırma Makalesi

Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise

Cilt: 6 Sayı: 3 30 Aralık 2021
PDF İndir
TR EN

Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise

Öz

Risk management play an important role on preventing failures of any enterprise as it ensures an effective planning and control. Not managing such failures including political, geographical, project, environmental, monetary, human, supply chain risks of the enterprises cause irreparable results. Therefore, there is a need for a comprehensive risk assessment approach regarding qualitative and quantitative risk factors. This paper tackles this need and Fishbone Diagram (FD) as a qualitative method and integrated 5x5 Matrix and Fault Tree Analysis (FTA) methods are used as quantitative methods. The root causes of the risks are examined by taking a project-based enterprise into consideration and evaluated by applying an integrated risk analysis method. Taking into account the risk analysis results obtained, measures are recommended. An improvement of approximately 24% has been achieved as a result of the application of measures. The efficiency of the proposed methods is illustrated in the real world data of a project-based pipeline manufacturing system and the obtained results demonstrate that practitioners and researchers can easily use these methods to prevent the risks.

Anahtar Kelimeler

Kaynakça

  1. Bertolini, M., Rizzi, A., & Bevilacqua, M. (2007). An alternative approach to HACCP system implementation. Journal of Food Engineering, 79(4), 1322-1328.
  2. Bertsche B. Reliability in automotive and mechanical engineering: determination of component and system reliability. Springer Berlin Heidelberg; 2008.
  3. Bluvband Z, Polak R, Grabov P. Bouncing failure analysis (bfa): the unified FTA-FMEA methodology. In: Annual reliability and maintainability symposium, 2005. Proceedings.; 2005. p. 463–7.
  4. Cheliyan, A. S., & Bhattacharyya, S. K. (2018). Fuzzy fault tree analysis of oil and gas leak- age in subsea production systems. Journal of Ocean Engineering and Science, 3(1), 38–48.
  5. Dağsuyu, C., Göçmen, E., Narlı, M., & Kokangül, A. (2016). Classical and fuzzy FMEA risk analysis in a sterilization unit. Computers & Industrial Engineering, 101, 286-294.
  6. Derse, O., & Göçmen, E. (2019). Transportation mode choice using fault tree analysis and mathematical modeling approach. Journal of Transportation Safety & Security, 1-19.
  7. Hu, Y. (2016). Research on the application of fault tree analysis for building fire safety of hotels. Procedia Engineering, 135, 524–530.
  8. Ilie, G., & Ciocoiu, C. N. (2010). Application of fishbone diagram to determine the risk of an event with multiple causes. Management research and practice, 2(1), 1-20.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Endüstri Mühendisliği

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

30 Aralık 2021

Gönderilme Tarihi

1 Eylül 2021

Kabul Tarihi

20 Aralık 2021

Yayımlandığı Sayı

Yıl 2021 Cilt: 6 Sayı: 3

Kaynak Göster

APA
Derse, O., & Göçmen Polat, E. (2021). Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise. Harran Üniversitesi Mühendislik Dergisi, 6(3), 183-197. https://doi.org/10.46578/humder.989695
AMA
1.Derse O, Göçmen Polat E. Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise. HUMDER. 2021;6(3):183-197. doi:10.46578/humder.989695
Chicago
Derse, Onur, ve Elifcan Göçmen Polat. 2021. “Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise”. Harran Üniversitesi Mühendislik Dergisi 6 (3): 183-97. https://doi.org/10.46578/humder.989695.
EndNote
Derse O, Göçmen Polat E (01 Aralık 2021) Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise. Harran Üniversitesi Mühendislik Dergisi 6 3 183–197.
IEEE
[1]O. Derse ve E. Göçmen Polat, “Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise”, HUMDER, c. 6, sy 3, ss. 183–197, Ara. 2021, doi: 10.46578/humder.989695.
ISNAD
Derse, Onur - Göçmen Polat, Elifcan. “Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise”. Harran Üniversitesi Mühendislik Dergisi 6/3 (01 Aralık 2021): 183-197. https://doi.org/10.46578/humder.989695.
JAMA
1.Derse O, Göçmen Polat E. Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise. HUMDER. 2021;6:183–197.
MLA
Derse, Onur, ve Elifcan Göçmen Polat. “Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise”. Harran Üniversitesi Mühendislik Dergisi, c. 6, sy 3, Aralık 2021, ss. 183-97, doi:10.46578/humder.989695.
Vancouver
1.Onur Derse, Elifcan Göçmen Polat. Application Of Integrated FTA And 5x5 Matrix for the Comprehensive Risk Evaluation of a Project-Based Enterprise. HUMDER. 01 Aralık 2021;6(3):183-97. doi:10.46578/humder.989695

Cited By