ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS
Abstract
Keywords
Kaynakça
- AbouRizk, S., Knowles, P., Hermann, U.R. (2001), “Estimating labor production rates for industrial construction activities”, Journal of Construction Engineering and Management, Vol. 127, No. 6, pp. 502-511.
- Chua, D.K.H., Kog, Y.C., Loh, P.K., Jaselskis, E.J. (1997), “Model for construction budget performance-neural network approach”, Journal of
- Construction Engineering and Management, Vol. 123, No. 33, pp. 214-222. Dawood, N. (1998), “Estimating project and activity duration: a risk management approach using network analysis”, Construction Management and Economics, Vol. 16, pp. 41-48.
- Dey, P.K. (2001), “Decision support system for risk management: A case study”,
- Management Decision, Vol. 39, No. 8, pp. 634-649. Hanna, A.S., Gunduz, M. (2005), “Early warning signs for distressed projects”,
- Canadian Journal of Civil Engineering, Vol. 32, No. 5, pp. 796-802. Hertz, D.B. Thomas, H. (1983), Risk analysis and its applications, John Wiley and Sons. New York, NY, USA.
- Jaselskis, E.J., Ashley, D.B. (1991), “Optimal allocation of project management resources for achieving success”, Journal of Construction Engineering and Management, Vol. 117, No. 2, pp. 321-340.
- Jaskowski, P., Biruk, S., Bucoń, R. (2010), “Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment”, Automation in Construction, Vol. 19, No. 2, pp. 120-126.
Ayrıntılar
Birincil Dil
İngilizce
Konular
-
Bölüm
-
Yazarlar
Piotr Jaskowski
Bu kişi benim
Slawomir Biruk
Bu kişi benim
Agata Czarnigowska
Bu kişi benim
Yayımlanma Tarihi
1 Haziran 2011
Gönderilme Tarihi
1 Haziran 2011
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2011 Cilt: 3 Sayı: 1