ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS

Cilt: 3 Sayı: 1 1 Haziran 2011
  • Piotr Jaskowski
  • Slawomir Biruk
  • Agata Czarnigowska
PDF İndir
EN

ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS

Abstract

The paper focuses on handling schedule risks. For each schedule activity, a statistical distribution of its duration is to be defined. Therefore, a research was undertaken to develop a method to assist planners in determining activity duration distribution parameters according to risk level. A triangular distribution was assumed, and its parameters estimated on the basis of three input values (the most likely, pessimistic and optimistic durations). In contrast to the Program Evaluation and Review Technique, the approach proposed in the paper assumes that these input values should be evaluated independently of the particular project’s conditions and could be derived from the planner’s database of past experience. For the risk evaluation, the AHP was adopted. The proposed risk model – considering the diversity of activity types – was based on evaluating and weighting the particular project’s characteristics and expected conditions. This approach, combined with simulation technique, is argued to improve project planning and evaluation of risk mitigation alternatives

Keywords

Kaynakça

  1. AbouRizk, S., Knowles, P., Hermann, U.R. (2001), “Estimating labor production rates for industrial construction activities”, Journal of Construction Engineering and Management, Vol. 127, No. 6, pp. 502-511.
  2. Chua, D.K.H., Kog, Y.C., Loh, P.K., Jaselskis, E.J. (1997), “Model for construction budget performance-neural network approach”, Journal of
  3. Construction Engineering and Management, Vol. 123, No. 33, pp. 214-222. Dawood, N. (1998), “Estimating project and activity duration: a risk management approach using network analysis”, Construction Management and Economics, Vol. 16, pp. 41-48.
  4. Dey, P.K. (2001), “Decision support system for risk management: A case study”,
  5. Management Decision, Vol. 39, No. 8, pp. 634-649. Hanna, A.S., Gunduz, M. (2005), “Early warning signs for distressed projects”,
  6. Canadian Journal of Civil Engineering, Vol. 32, No. 5, pp. 796-802. Hertz, D.B. Thomas, H. (1983), Risk analysis and its applications, John Wiley and Sons. New York, NY, USA.
  7. Jaselskis, E.J., Ashley, D.B. (1991), “Optimal allocation of project management resources for achieving success”, Journal of Construction Engineering and Management, Vol. 117, No. 2, pp. 321-340.
  8. Jaskowski, P., Biruk, S., Bucoń, R. (2010), “Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment”, Automation in Construction, Vol. 19, No. 2, pp. 120-126.

Ayrıntılar

Birincil Dil

İngilizce

Konular

-

Bölüm

-

Yazarlar

Piotr Jaskowski Bu kişi benim

Slawomir Biruk Bu kişi benim

Agata Czarnigowska Bu kişi benim

Yayımlanma Tarihi

1 Haziran 2011

Gönderilme Tarihi

1 Haziran 2011

Kabul Tarihi

-

Yayımlandığı Sayı

Yıl 2011 Cilt: 3 Sayı: 1

Kaynak Göster

APA
Jaskowski, P., Biruk, S., & Czarnigowska, A. (2011). ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS. International Journal of Business and Management Studies, 3(1), 299-307. https://izlik.org/JA89AZ92GA
AMA
1.Jaskowski P, Biruk S, Czarnigowska A. ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS. IJBMS. 2011;3(1):299-307. https://izlik.org/JA89AZ92GA
Chicago
Jaskowski, Piotr, Slawomir Biruk, ve Agata Czarnigowska. 2011. “ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS”. International Journal of Business and Management Studies 3 (1): 299-307. https://izlik.org/JA89AZ92GA.
EndNote
Jaskowski P, Biruk S, Czarnigowska A (01 Haziran 2011) ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS. International Journal of Business and Management Studies 3 1 299–307.
IEEE
[1]P. Jaskowski, S. Biruk, ve A. Czarnigowska, “ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS”, IJBMS, c. 3, sy 1, ss. 299–307, Haz. 2011, [çevrimiçi]. Erişim adresi: https://izlik.org/JA89AZ92GA
ISNAD
Jaskowski, Piotr - Biruk, Slawomir - Czarnigowska, Agata. “ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS”. International Journal of Business and Management Studies 3/1 (01 Haziran 2011): 299-307. https://izlik.org/JA89AZ92GA.
JAMA
1.Jaskowski P, Biruk S, Czarnigowska A. ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS. IJBMS. 2011;3:299–307.
MLA
Jaskowski, Piotr, vd. “ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS”. International Journal of Business and Management Studies, c. 3, sy 1, Haziran 2011, ss. 299-07, https://izlik.org/JA89AZ92GA.
Vancouver
1.Piotr Jaskowski, Slawomir Biruk, Agata Czarnigowska. ESTIMATING DISTRIBUTION PARAMETERS OF SCHEDULE ACTIVITY DURATION ON THE BASIS OF RISK RELATED TO EXPECTED PROJECT CONDITIONS. IJBMS [Internet]. 01 Haziran 2011;3(1):299-307. Erişim adresi: https://izlik.org/JA89AZ92GA