Büyük Veriyle Kaynak ve Kapasite Kısıtları Altında Üretim Planlama ve Çizelgeleme
Öz
Anahtar Kelimeler
Kaynakça
- Amankwah, H. (2011), “Mathematical Optimization Models And Methods For Open-Pit Mining”, Phd Thesis. Linköping University Electronic Press, 1-133.
- Bley, A., Boland, N., Fricke, C., & Froyland, G. (2010). A strengthened formu-lation and cutting planes for the open pit mine production scheduling problem. Computers & Operations Research, 37(9), 1641-1647.
- Boland, N., Dumitrescu, I., Froyland, G., & Gleixner, A. M. (2009). LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Computers & Opera-tions Research, 36(4), 1064-1089.
- Boucher, A., & Dimitrakopoulos, R. (2009). Block simulation of multiple cor-related variables. Mathematical Geosciences, 41(2), 215-237.
- Caccetta, L. Ve Hill, S. (2003), “An Application Of Branch And Cut To Open Pit Mine Scheduling”, Journal Of Global Optimization, 27(2–3), 349–365.
- Dantzig, G. (1948), “Programming In A Linear Structure”, Washington.
- Dantzig, G. ve Wolfe, P. (1960), “Decomposition Principle For Linear Prog-rams”, Operations Research, 8(1), 101-111.
- Dagdelen, K., & Johnson, T. (1986). Optimum open pit mine production sche-duling by Lagrangian parameterization.In 19th APCOM, University Park, PA (pp. 127–141).
Ayrıntılar
Birincil Dil
Türkçe
Konular
İşletme
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
31 Aralık 2021
Gönderilme Tarihi
12 Nisan 2020
Kabul Tarihi
5 Eylül 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 36 Sayı: 4
Cited By
Fintek Kavramı ve İslami Finans Kurumlarında Kullanılan Güncel Fintek Uygulamaları
Kocatepe İslami İlimler Dergisi
https://doi.org/10.52637/kiid.1323142Prioritization of criteria for production planning software selection using picture fuzzy PIPRECIA method: A case of the Ordu province
Journal of Process Management and New Technologies
https://doi.org/10.5937/jpmnt13-62702