In civil aviation
sector, the design of airports is divided into two as air side and ground side.
The latter part of second security gate in terminal building at the airports is
defined as air side in the literature (which is defined as customs area). The
air side is also divided into; ground service and airspace. In this research,
the concept of ramp services which constitutes basic content of ground service
management process is examined. One of the two most important causes of delays
in civil air traffic is that ramp services can not be planned effectively (the
other reason is that airport capacity is extremely dense), so this concept
needs to be well analyzed and evaluated. The performance measurement system
(PMS) and balanced scorecard (BSC) methods in this review are examined in terms
of the conceptual background within design, measurement and implementation phases
for effective ramp services process in ground handling management.
Performance measurement system (PMS) balanced scorecard (BSC) conceptual background ground handling management ramp handling services
In civil aviation sector, the design of airports is divided into two as air side and ground side. The latter part of second security gate in terminal building at the airports is defined as air side in the literature (which is defined as customs area). The air side is also divided into; ground service and airspace. In this research, the concept of ramp services which constitutes basic content of ground service management process is examined. One of the two most important causes of delays in civil air traffic is that ramp services can not be planned effectively (the other reason is that airport capacity is extremely dense), so this concept needs to be well analyzed and evaluated. The performance measurement system (PMS) and balanced scorecard (BSC) methods in this review are examined in terms of the conceptual background within design, measurement and implementation phases for effective ramp services process in ground handling management.
Performance Measurement System (PMS) Balanced Scorecard (BSC) Conceptual Background Ground Handling Management Ramp Handling Services
Birincil Dil | İngilizce |
---|---|
Bölüm | Araştırma Makaleleri |
Yazarlar | |
Yayımlanma Tarihi | 26 Haziran 2018 |
Gönderilme Tarihi | 5 Mart 2018 |
Kabul Tarihi | 22 Mayıs 2018 |
Yayımlandığı Sayı | Yıl 2018 |
Journal of Aviation - JAV |
This journal is licenced under a Creative Commons Attiribution-NonCommerical 4.0 İnternational Licence