Araştırma Makalesi

Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized

Cilt: 1 Sayı: 1 1 Eylül 2018
PDF İndir
TR EN

Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized

Öz

Process planning, scheduling and due date assignment are three important manufacturing functions in production system in which process planning is input to scheduling processes. Because of rigid process plans, alternative plans are not used that may affect global performance improvement in a bad way. Besides, scheduling without considering process plans causes unbalanced machine loadings and leads to several bottlenecks. In the literature, there are numerous works on process planning and scheduling and works on scheduling with due date assignment. These three functions are not integrated much. According to literature, due dates are assigned without considering weights of the customer. In this study, these three functions are integrated and due dates are given according to the importance of the customers. Eight shop floors are studied. Different levels of integration of these three functions are tested and compared with each other. Two search techniques used which are genetic search and random search and results are compared with ordinary solutions. As the level of integration increased solutions became better and search techniques gave a better result than ordinary solutions and the genetic search outperformed random search.

Anahtar Kelimeler

Kaynakça

  1. Adamopoulos, G.I., Pappis, C.P., 1998. Scheduling under a common due-data on parallel unrelated machines. Eur. J. Oper. Res. 105, 494–501.
  2. Biskup, D., Jahnke, H., 2001. Common due date assignment for scheduling on a single machine with jointly reducible processing times. Int. J. Prod. Econ. 69, 317–322.
  3. Brandimarte, P., 1999. Exploiting process plan flexibility in production scheduling: A multi-objective approach. Eur. J. Oper. Res. 114, 59–71.
  4. Ceven, E., Demir, H.I., 2007. Benefits of Integrating Due-Date Assignment with Process Planning and Scheduling (Master of Science Thesis). Sakarya University.Chen, Q.M., Khoshnevis, B., 1993. Scheduling with flexible process plans. Prod. Plan. Control 4, 333–343.
  5. Cheng, T.C.E., Chen, Z.-L., Shakhlevich, N.V., 2002. Common due date assignment and scheduling with ready times. Comput. Oper. Res. 29, 1957–1967.
  6. Cheng, T.C.E., Kovalyov, M.Y., 1999. Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness. Eur. J. Oper. Res. 114, 403–410.
  7. Demir, H.I., Taskin, H., 2005. Integrated Process Planning, Scheduling and Due-Date Assignment (PhD Thesis). Sakarya University.
  8. Demir, H.I., Taskin, H., Cakar, T., 2004. Integrated process planning, scheduling and due-date assignment. Presented at the International Intelligent Manufacturing Systems, Sakarya, Turkey, pp. 1165–1175.

Ayrıntılar

Birincil Dil

İngilizce

Konular

Endüstri Mühendisliği

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Eylül 2018

Gönderilme Tarihi

11 Haziran 2018

Kabul Tarihi

1 Ağustos 2018

Yayımlandığı Sayı

Yıl 2018 Cilt: 1 Sayı: 1

Kaynak Göster

APA
Demir, H. İ., Canpolat, O., Erden, C., & Şimşir, F. (2018). Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized. Journal of Intelligent Systems: Theory and Applications, 1(1), 16-25. https://doi.org/10.38016/jista.433085
AMA
1.Demir Hİ, Canpolat O, Erden C, Şimşir F. Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized. jista. 2018;1(1):16-25. doi:10.38016/jista.433085
Chicago
Demir, Halil İbrahim, Onur Canpolat, Caner Erden, ve Fuat Şimşir. 2018. “Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized”. Journal of Intelligent Systems: Theory and Applications 1 (1): 16-25. https://doi.org/10.38016/jista.433085.
EndNote
Demir Hİ, Canpolat O, Erden C, Şimşir F (01 Eylül 2018) Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized. Journal of Intelligent Systems: Theory and Applications 1 1 16–25.
IEEE
[1]H. İ. Demir, O. Canpolat, C. Erden, ve F. Şimşir, “Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized”, jista, c. 1, sy 1, ss. 16–25, Eyl. 2018, doi: 10.38016/jista.433085.
ISNAD
Demir, Halil İbrahim - Canpolat, Onur - Erden, Caner - Şimşir, Fuat. “Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized”. Journal of Intelligent Systems: Theory and Applications 1/1 (01 Eylül 2018): 16-25. https://doi.org/10.38016/jista.433085.
JAMA
1.Demir Hİ, Canpolat O, Erden C, Şimşir F. Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized. jista. 2018;1:16–25.
MLA
Demir, Halil İbrahim, vd. “Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized”. Journal of Intelligent Systems: Theory and Applications, c. 1, sy 1, Eylül 2018, ss. 16-25, doi:10.38016/jista.433085.
Vancouver
1.Halil İbrahim Demir, Onur Canpolat, Caner Erden, Fuat Şimşir. Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized. jista. 01 Eylül 2018;1(1):16-25. doi:10.38016/jista.433085

Zeki Sistemler Teori ve Uygulamaları Dergisi