Sektörel Bazda Gruplandırılmış Tedarikçiler İçin Ödeme Önceliğinin ÇKKV İle Belirlenmesi
Öz
Anahtar Kelimeler
Kaynakça
- Akkaya G, Turanoğlu B, Öztaş S. (2015). An ıntegrated Fuzzy AHP and Fuzzy MOORA approach to the problem of industrial engineering sector choosing. Expert Systems With Applications; 42(24), 1-9.
- Akyüz Y., Bozğdoğan T., Hantekin E. (2011). TOPSIS yöntemiyle finansal performansın değerlendirilmesi ve bir uygulama, 77-80.
- Amid A, Ghodsypour SH, O’Brien C. (2011). A weighted max–min model for fuzzy multi-objective supplier selection in a supply chain. International Journal of Production Economics, 131, 139-145.
- Arıbaş, M., Özcan, U. (2015). Evaluation of academic research projects using AHP and TOPSIS methods. Journal of Polytechnic, 19 (2), 163-173.
- Awasthi, A., Govindan, K. (2016). Green supplier development program selection using NGT and VIKOR under fuzzy environment. Computers and Industrial Engineering, 91, 100-108.
- Celik, C., Alkan, A., & Aladağ, Z. (2016). Otomotiv sektöründe faaliyet gösteren bir firmada tedarikçi seçimi: Ahp-bulanık ahp ve topsis uygulaması.
- Dağdeviren, M., Tamer, E. (2001). Tedarikçi firma seçiminde analitik hiyerarşi prosesi ve 0-1 hedef programlama yöntemlerinin kullanılması. Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi, 16 (2), 41-52.
- Denizhan, B. Yalçıner, A.Y., & Berber, Ş. (2017). Analitik hiyerarşi proses ve bulanık analitik hiyerarşi proses yöntemleri kullanılarak yeşil tedarikçi seçimi uygulaması. Nevşehir Bilim ve Teknoloji Dergisi, 6 (1), 63-78
Ayrıntılar
Birincil Dil
Türkçe
Konular
Finans
Bölüm
Araştırma Makalesi
Yazarlar
Hilal Yildiz
0000-0002-9389-1433
Türkiye
Yayımlanma Tarihi
27 Aralık 2020
Gönderilme Tarihi
29 Haziran 2020
Kabul Tarihi
8 Aralık 2020
Yayımlandığı Sayı
Yıl 2020 Cilt: 5 Sayı: 2