Araştırma Makalesi

THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH

Cilt: 4 Sayı: 2 1 Aralık 2019
PDF İndir
TR EN

THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH

Öz

Many researchers use traditional computing processes that take the first and second-order partial derivatives to obtain closed form mathematical equations for the optimal order quantity or the optimal production quantity. However, this paper provides an algebraic approach to solving the production lot sizing problem in an imperfect production inventory system where an inspection process is conducted during and at the end of production, and any defective items produced are either sold at a discounted price or reworked/repaired at a cost. Using this approach, practitioners or first-year college students who lack knowledge of differential calculus may be able to find solutions to inventory problems more easily.

Anahtar Kelimeler

Kaynakça

  1. Benkherouf, L., & Mohamed, O. (2017). Optimal manufacturing batch size with rework for a finite-horizon and time-varying demand rates inventory model. RAIRO-Operations Research, 57(1), 173-187.
  2. Cárdenas-Barrón, L.E. (2001). The economic production quantity (EPQ) with shortage derived algebraically. International Journal of Production Economics, 70, 289-292.
  3. Cárdenas Barrón, L.E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 57, 1105-1113.
  4. Cárdenas-Barrón, L.E. (2011). The deriavtion of EOQ/EPQ inventory models with two backorders costsusing analytic geometry and algebra. Applied Mathematical Modelling, 35, 2394-2407.
  5. Chen, C. K., Lo, C. C., & Liao, Y. X. (2008). Optimal lot size with learning consideration on an imperfect production system with allowable shortages. International Journal of Production Economics, 113(1), 459–469.
  6. Chen K. -K., Wu, M. -F., Chiu, S.W., & Lee, C. -H. (2012). Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework. Expert Systems with Applications, 39, 2232–2235.
  7. Chiu, S. W. (2008). Production lot size problem with failure in repair and backlogging derived without derivatives”, European Journal of Operational Research, 188, 610–615.
  8. Chiu, S. W., Chen, K. -K., & Chiu, Y.-S. P. (2012). Notes on the mathematical modelling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments. Applied Mathematics Letters, 25, 1964-1968.

Ayrıntılar

Birincil Dil

İngilizce

Konular

İşletme

Bölüm

Araştırma Makalesi

Yayımlanma Tarihi

1 Aralık 2019

Gönderilme Tarihi

12 Kasım 2018

Kabul Tarihi

12 Eylül 2019

Yayımlandığı Sayı

Yıl 2019 Cilt: 4 Sayı: 2

Kaynak Göster

APA
Öztürk, H. (2019). THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH. Journal of Research in Business, 4(2), 93-110. https://izlik.org/JA96LL97KS
AMA
1.Öztürk H. THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH. JRB. 2019;4(2):93-110. https://izlik.org/JA96LL97KS
Chicago
Öztürk, Harun. 2019. “THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH”. Journal of Research in Business 4 (2): 93-110. https://izlik.org/JA96LL97KS.
EndNote
Öztürk H (01 Aralık 2019) THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH. Journal of Research in Business 4 2 93–110.
IEEE
[1]H. Öztürk, “THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH”, JRB, c. 4, sy 2, ss. 93–110, Ara. 2019, [çevrimiçi]. Erişim adresi: https://izlik.org/JA96LL97KS
ISNAD
Öztürk, Harun. “THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH”. Journal of Research in Business 4/2 (01 Aralık 2019): 93-110. https://izlik.org/JA96LL97KS.
JAMA
1.Öztürk H. THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH. JRB. 2019;4:93–110.
MLA
Öztürk, Harun. “THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH”. Journal of Research in Business, c. 4, sy 2, Aralık 2019, ss. 93-110, https://izlik.org/JA96LL97KS.
Vancouver
1.Harun Öztürk. THE DERIVATION OF PRODUCTION LOT SIZING WITH IMPERFECT QUALITY, INSPECTION AND REWORK USING AN ALGEBRAIC APPROACH. JRB [Internet]. 01 Aralık 2019;4(2):93-110. Erişim adresi: https://izlik.org/JA96LL97KS