In this study, pre-concentration possibilities of Murgul copper ore was investigated by using a
laboratory scale teetered bed separator (TBS). Also effect of operational parameters on different
minerals in the ore was evaluated. Results indicated that silica removal achieved in high mass and
recovery before flotation. Gold and sulfur recoveries of TBS underflow was similar. An increase
in pressure set point increases gold and sulfur recovery of TBS underflow. But an increase in
teeter water rate decreases gold and sulfur recovery of TBS underflow. TBS tests were presented
significant results about behavior of different density minerals under hindered settling conditions.
The TBS underflow product which has highest gold and sulfur recovery was subjected to shaking
table test as a pre concentrate. According to test results 11.63% of the shaking table feed can
be concentrated with 4.39 ppm gold grade and 64.42% recovery as a final concentrate. The
concentrate has also a higher sulfur grade as 48.46%.
Teetered bed separator (TBS) Gold Copper Murgul Hindered settling
Kabaran yataklı ayırıcı (KYA) Altın Bakır Murgul Engelli çökelme
Birincil Dil | Türkçe |
---|---|
Bölüm | Araştırma Makalesi |
Yazarlar | |
Yayımlanma Tarihi | 1 Eylül 2018 |
Gönderilme Tarihi | 16 Şubat 2018 |
Yayımlandığı Sayı | Yıl 2018 |