BibTex RIS Kaynak Göster

Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway

Yıl 2000, Cilt: 39 Sayı: 2, 11 - 22, 01.06.2000

Öz

In this study, firstly, line drilling, smooth blasting and presplitting, which are known as controlled blasting techniques; are described in detail. Then, the applications of line drilling and smooth blasting in the T2 tunnel on the Tarsus Crossing-Gaziantep Motorway are given as an example. Fracturing beyond the excavation line and over breaking were minimised with a successful application of line drilling and smooth blasting in the T2 tunnel. As a result, less reinforcement and less concrete were needed and the cost was lowered

KONTROLLÜ PATLATMA YÖNTEMLERİ VE TARSUS AYRIMI-GAZİANTEP OTOYOLU T2 TÜNELİ UYGULAMASI

Yıl 2000, Cilt: 39 Sayı: 2, 11 - 22, 01.06.2000

Öz

Bu çalışmada, önce kontrollü patlatma yöntemleri olarak bilinen hat delme, son-kesme ve ön-kesme detaylı olarak anlatılmıştır. Sonra Tarsus Ayrımı-Gaziantep Otoyolu T2 tünelinde son-kesme ve hat delme uygulamaları örnek olarak verilmiştir. T2 tünelinde başarılı bir son-kesme ve hat delme uygulaması ile kazı hattı dışındaki kayaçta çatlamalar ve aşın kazı en aza indirilmiştir. Bunun sonucunda tahkimat ve püskürtme beton kullanımı azaltılmış ve maliyet düşürülmüştür

Toplam 0 adet kaynakça vardır.

Ayrıntılar

Diğer ID JA28YK96TU
Bölüm Araştırma Makalesi
Yazarlar

Sair Kahraman Bu kişi benim

Alaettin Kılıç Bu kişi benim

Yayımlanma Tarihi 1 Haziran 2000
Gönderilme Tarihi 1 Haziran 2000
Yayımlandığı Sayı Yıl 2000 Cilt: 39 Sayı: 2

Kaynak Göster

APA Kahraman, S., & Kılıç, A. (2000). Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway. Scientific Mining Journal, 39(2), 11-22.
AMA Kahraman S, Kılıç A. Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway. Mining. Haziran 2000;39(2):11-22.
Chicago Kahraman, Sair, ve Alaettin Kılıç. “Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway”. Scientific Mining Journal 39, sy. 2 (Haziran 2000): 11-22.
EndNote Kahraman S, Kılıç A (01 Haziran 2000) Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway. Scientific Mining Journal 39 2 11–22.
IEEE S. Kahraman ve A. Kılıç, “Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway”, Mining, c. 39, sy. 2, ss. 11–22, 2000.
ISNAD Kahraman, Sair - Kılıç, Alaettin. “Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway”. Scientific Mining Journal 39/2 (Haziran 2000), 11-22.
JAMA Kahraman S, Kılıç A. Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway. Mining. 2000;39:11–22.
MLA Kahraman, Sair ve Alaettin Kılıç. “Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway”. Scientific Mining Journal, c. 39, sy. 2, 2000, ss. 11-22.
Vancouver Kahraman S, Kılıç A. Controlled Blasting Techniques and The Application of The T2 Tunnel on The Tarsus Crossing-Gaziantep Motorway. Mining. 2000;39(2):11-22.