BibTex RIS Kaynak Göster

The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway

Yıl 1999, Cilt: 38 Sayı: 3, 31 - 35, 01.06.1999

Öz

In this study, the performance analysis of the hydraulic top hammer drills used in the construction of Pozantı-Tarsus crossing motorway was described. The performance of drills was analysed by using Drill Rig Availability (DRA) and Drill Rig Usage (DRU) as evaluation criteria. It was shown that DRA of the drills conformed to international standards. But, it was found that DRU was lower than the standard values, due to the heavily jointed formation, which causes caving in the holes

POZANTI - TARSUS AYRIMI OTOYOL İNŞAATINDA KULLANILMIŞ OLAN DELİCİ MAKİNELERİN PERFORMANS ANALİZİ

Yıl 1999, Cilt: 38 Sayı: 3, 31 - 35, 01.06.1999

Öz

Bu çalışmada, Pozantı-Tarsus ayrımı otoyol inşaatında kullanılmış olan yerüstünden darbeli hidrolik deliciler üzerinde yapılan performans analizi anlatılmıştır. Performans analizinde değerlendirme kriteri olarak Makine Kullanılabilirlik Oram (MKO) ve Makineden Faydalanma Oram (MFO) kullanılmıştu:. Yapılan performans analizi sonucunda delicilerin MKO' larınm uluslararası standartlara uygun olduğu görülmüştür. Fakat MFO değerleri standart değerlerden düşük çıkmıştır. Bu durumun formasyonların çok kırıklı-çatlaklı olması nedeniyle delikte göçükler meydana getirmesinden ileri geldiği sonucuna varılmıştır

Toplam 0 adet kaynakça vardır.

Ayrıntılar

Diğer ID JA42FE35KM
Bölüm Araştırma Makalesi
Yazarlar

Sair Kahraman Bu kişi benim

Ayhan Mülazımoğlu Bu kişi benim

Yayımlanma Tarihi 1 Haziran 1999
Gönderilme Tarihi 1 Haziran 1999
Yayımlandığı Sayı Yıl 1999 Cilt: 38 Sayı: 3

Kaynak Göster

APA Kahraman, S., & Mülazımoğlu, A. (1999). The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Scientific Mining Journal, 38(3), 31-35.
AMA Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. Haziran 1999;38(3):31-35.
Chicago Kahraman, Sair, ve Ayhan Mülazımoğlu. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal 38, sy. 3 (Haziran 1999): 31-35.
EndNote Kahraman S, Mülazımoğlu A (01 Haziran 1999) The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Scientific Mining Journal 38 3 31–35.
IEEE S. Kahraman ve A. Mülazımoğlu, “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”, Mining, c. 38, sy. 3, ss. 31–35, 1999.
ISNAD Kahraman, Sair - Mülazımoğlu, Ayhan. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal 38/3 (Haziran 1999), 31-35.
JAMA Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. 1999;38:31–35.
MLA Kahraman, Sair ve Ayhan Mülazımoğlu. “The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway”. Scientific Mining Journal, c. 38, sy. 3, 1999, ss. 31-35.
Vancouver Kahraman S, Mülazımoğlu A. The Performance Analysis of Drill Rigs Used in the Construction of Pozantı - Tarsus Crossing Motorway. Mining. 1999;38(3):31-5.