BibTex RIS Kaynak Göster

The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations

Yıl 1997, Cilt: 36 Sayı: 1, 11 - 20, 01.03.1997

Öz

In this work, risk of Cutoff Si02 % decisions in Magnesite mining operations were aimed to measure. For this purpose, regression model parameters were firstly investigated for initial and working capital, finance for magnesite mining operations and estimates of constant are quality. Risk analysis model, which calculates annually cash flows and rate of net present value profitability criterions by making various numbers of random sampling from expected errors in regression estimates, was improved. Risk parameters for cutoff Si0 % decisions were determined by calculating profitability criterions distribution parameters and risk analysis model, improved on the basis of Monte Carlo Simulation Method. At the sametime, the effects of ore reserve, capacity, ore price and variations in CaO % on the risks of cutoff Si02 % decisions were also investigated

MANYEZİT MADEN İŞLETMECİLİĞİNDE SINIR % Sİ02 KARARLARI RİSKLİLİĞİ

Yıl 1997, Cilt: 36 Sayı: 1, 11 - 20, 01.03.1997

Öz

Bu çalışmada, manyezit maden işletmeciliğinde sınır % Si02 kararlan riskliliğinin ölçülmesi amaçlanmıştır. Bu amaçla öncelikle, manyezit maden işletmeciliğinde ilk yatırım, işletme sermayesi ve işletme giderleri ile cevher kalite katsayısı tahminleri için regresyon model parametreleri araştırılmıştır. Regresyon tahminlerinde beklenen hatalardan belirli sayıda rassal örneklemede yaparak yıllık nakit akımlarını ve net bugünkü değer oranı karlılık ölçütlerini hesaplayan risk analiz modeli geliştirilmiştir. Monte Carlo Benzetim Yöntemi temelinde geliştirilen risk analiz modeli ile karlılık ölçütleri dağılım parametreleri de hesaplanarak, sınır % Si02 kararlarının risklilik dereceleri belirlenmiştir. Aynı zamanda, cevher rezervi, üretim kapasitesi, cevher satış fiyatı ve % CaO değerlerindeki değişimlerin sınır % Si02 kararlan riskliliğine etkileri de araştırılmıştır

Toplam 0 adet kaynakça vardır.

Ayrıntılar

Diğer ID JA56FC22MV
Bölüm Araştırma Makalesi
Yazarlar

H. Gürkan Yersel Bu kişi benim

Adnan Konuk Bu kişi benim

Yayımlanma Tarihi 1 Mart 1997
Gönderilme Tarihi 1 Mart 1997
Yayımlandığı Sayı Yıl 1997 Cilt: 36 Sayı: 1

Kaynak Göster

APA Yersel, H. G., & Konuk, A. (1997). The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations. Scientific Mining Journal, 36(1), 11-20.
AMA Yersel HG, Konuk A. The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations. Mining. Mart 1997;36(1):11-20.
Chicago Yersel, H. Gürkan, ve Adnan Konuk. “The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations”. Scientific Mining Journal 36, sy. 1 (Mart 1997): 11-20.
EndNote Yersel HG, Konuk A (01 Mart 1997) The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations. Scientific Mining Journal 36 1 11–20.
IEEE H. G. Yersel ve A. Konuk, “The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations”, Mining, c. 36, sy. 1, ss. 11–20, 1997.
ISNAD Yersel, H. Gürkan - Konuk, Adnan. “The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations”. Scientific Mining Journal 36/1 (Mart 1997), 11-20.
JAMA Yersel HG, Konuk A. The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations. Mining. 1997;36:11–20.
MLA Yersel, H. Gürkan ve Adnan Konuk. “The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations”. Scientific Mining Journal, c. 36, sy. 1, 1997, ss. 11-20.
Vancouver Yersel HG, Konuk A. The Risks of Cutoff SİO2 % Decisions in Magnesite Mining Operations. Mining. 1997;36(1):11-20.