One of the most important problems faced in open pits is the excess water surfacing and accumulating in working area. Because, the water prevents the operation of mining machines, decreases the production and slows down the transportation. A similar problem arises in the removal of overburden and coal production at Bolu Göynük lignite mine which has a potential of 43,4 x 106 ton. To solve this problem a hydrogeological investigation was carried out. Surface drainage system, physical parameters of drainage areas, maximum flood magnitudes of 2,5,10,25,50, and 100 years recurrance intervals were determined. The permeability coefficients of layers overlying the coal bed, which show point value character, were found by laboratory analysis of the field samples
Açık işletmeciliğin önemli sorunlarından biri yapılan kazılar esnasında ve sonraki aşamalarda ortaya çıkan suların yüzeyde birikmesinden ötürü iş makinalarının çalışmasının engellenmesi ve bu nedenle üretimin ve taşınmanın olumsuz yönde etkilenmesidir. 43,4 milyon ton linyit kömürü potansiyeline sahip Bolu-Göynük linyit işletmesinde dekepaj ve kömür çıkarılması sırasında benzer sorun ortaya çıkmıştır. Bu sorunu çözmek amacıyla yapılan hidrojeolojik araştırmanın ön etüdünde topografya ile jeolojik yapı birlikte değerlendirilerek çevre yüzey suları drenaj ağı, fiziksel havza parametreleri belirlenmiş ve olası 2, 5, 10, 25, 50, 100 yıl tekerrür süreli maksimum taşkın değerleri hesaplanmıştır
Diğer ID | JA24PP68CU |
---|---|
Bölüm | Araştırma Makalesi |
Yazarlar | |
Yayımlanma Tarihi | 1 Aralık 1989 |
Gönderilme Tarihi | 1 Aralık 1989 |
Yayımlandığı Sayı | Yıl 1989 Cilt: 28 Sayı: 4 |