EN
TR
Complexity Management in Large Construction Projects: Identifying Factors and Variables
Öz
This study answers the questions “what are the main factors of complexity in large projects?” and “what kind of relationships are there among the factors?” To answer these questions, the purpose of this research is identifying the factors of project complexity in the large construction and the relationships among them. Structural, technological, and environmental complexities considered as the main themes, and they formed the main components of the conceptual model. Research strategy is multiple case study in Iranian large construction projects, and research method is survey. The project experts of the selected cases form the research population, and stratified sampling method is the sample selection method. Accordingly, 300 questionnaires were distributed among the members, and finally 120 completed questionnaires were analyzed using structural modeling. The findings indicate that there is a significant relationship between environmental complexity and project complexity. That is, when the complexity of the project environment, including economic, social, and political factors, raise, the complexity of the project increases too, while both technological and structural complexities at the 0.001 level affect project complexity less than environmental factos. In other words, the relationships between technological and structural complexities with project complexity in Iranian large projects are weaker than environmental complexity. So, the intensity of the relationship between the last two factors is slightly different with the literature.
Anahtar Kelimeler
Kaynakça
- ALGEO, Chivonne (2014), “Action Research in a Project Environment”, The Sage Encyclopedia of Action Research (Eds. D. Coghlan, M. Brydon-Miller), Sage Publisher, Thousand Oaks, ss.659-661.
- BACCARINI, David (1996), “The Concept of Project Complexity - A Review”, International Journal of Project Management, S.14(4), ss.201-204.
- BAKHSHI, Javad, IRELAND, Vernon and GOROD, Alex (2016), “Clarifying the Project Complexity Construct: Past, Present and Future”, International Journal of Project Management, S.34(7), ss.1199-1213.
- BOSCH-REKVELDT, Marian, JONGKIND, Yuri, MOOI, Herman, BAKKER, Hans and VERBRAECK, Alexander (2011), “Grasping Project Complexity in Large Engineering Projects: The TOE (Technical, Organizational and Environmental) Framework”, International Journal of Project Management, S.29(6), ss.728-739.
- BROEKEL, Tom (2017), “Measuring Technological Complexity-Current Approaches and a New Measure of Structural Complexity”, arXiv preprint arXiv:1708.07357, https://arxiv.org/pdf/1708.07357.pdf (Erişim Tarihi: 03.08.2021).
- CALVO-PORRAL, Cristina and LÉVY-MANGIN, Jean-Pierre (2020), “The Circular Economy Business Model: Examining Consumers’ Acceptance of Recycled Goods”, Administrative Sciences, S.10(2), ss.(Article 28).
- CANADIAN CONSTRUCTION ASSOSIATION (2020), “The Impact of the Construction Industry is Everywhere”, Value of Industry (E-Article), https://www.cca-acc.com/about-us/value-of-industry/ (Erişim Tarihi: 03.08.2021).
- CHAN, Wai-Ming (1998), “Modelling Construction Durations for Public Housing Projects in Hong Kong”, Thesis, The University of Hong Kong, Pokfulam (Hong Kong).
Ayrıntılar
Birincil Dil
İngilizce
Konular
İşletme
Bölüm
Araştırma Makalesi
Yazarlar
Yayımlanma Tarihi
31 Aralık 2022
Gönderilme Tarihi
11 Mart 2022
Kabul Tarihi
21 Eylül 2022
Yayımlandığı Sayı
Yıl 2022 Cilt: 5 Sayı: 3
APA
Salehi, A. (2022). Complexity Management in Large Construction Projects: Identifying Factors and Variables. Uluslararası Yönetim Akademisi Dergisi, 5(3), 483-498. https://doi.org/10.33712/mana.1086105
AMA
1.Salehi A. Complexity Management in Large Construction Projects: Identifying Factors and Variables. Yönetim Akademisi. 2022;5(3):483-498. doi:10.33712/mana.1086105
Chicago
Salehi, Ali. 2022. “Complexity Management in Large Construction Projects: Identifying Factors and Variables”. Uluslararası Yönetim Akademisi Dergisi 5 (3): 483-98. https://doi.org/10.33712/mana.1086105.
EndNote
Salehi A (01 Aralık 2022) Complexity Management in Large Construction Projects: Identifying Factors and Variables. Uluslararası Yönetim Akademisi Dergisi 5 3 483–498.
IEEE
[1]A. Salehi, “Complexity Management in Large Construction Projects: Identifying Factors and Variables”, Yönetim Akademisi, c. 5, sy 3, ss. 483–498, Ara. 2022, doi: 10.33712/mana.1086105.
ISNAD
Salehi, Ali. “Complexity Management in Large Construction Projects: Identifying Factors and Variables”. Uluslararası Yönetim Akademisi Dergisi 5/3 (01 Aralık 2022): 483-498. https://doi.org/10.33712/mana.1086105.
JAMA
1.Salehi A. Complexity Management in Large Construction Projects: Identifying Factors and Variables. Yönetim Akademisi. 2022;5:483–498.
MLA
Salehi, Ali. “Complexity Management in Large Construction Projects: Identifying Factors and Variables”. Uluslararası Yönetim Akademisi Dergisi, c. 5, sy 3, Aralık 2022, ss. 483-98, doi:10.33712/mana.1086105.
Vancouver
1.Ali Salehi. Complexity Management in Large Construction Projects: Identifying Factors and Variables. Yönetim Akademisi. 01 Aralık 2022;5(3):483-98. doi:10.33712/mana.1086105
