VERİLEN PROJE SÜRESİ İÇİNDE DÜZGÜN KAPASİTE İHTİYAÇ DAĞILIMINI AMAÇLAYAN BİR TAMSAYILI PROGRAMLAMA MODELİ ÖNERİSİ ve BUNA YÖNELİK UYGULAMA
Öz
Anahtar Kelimeler
Kaynakça
- [1] WASCHECK, G.; WECKERLE, E., Die Praxis der Netzplantechnik, Verlag für Unternehmensführung Dr.Max Gehlen, 1967, s.326.
- [2] SCHWARZE, J., Netzplantechnik: Eine Einführung in das Projektmanagement, 7.Auflage, Verlag Neue Wirtschafts-Briefe, Berlin, 1994, s.206
- [3] ZIMMERMANN, W., Quantitative Methoden zur Entscheidungsvorbereitung, R. Oldenbourg Verlag, München, Wien, 1992, s.36
- [4] ALVEREZ-VALDES, E.; TAMARIT, J.M., Heuristic Algorithms for Resource-Constrained Project Scheduling: A Review and an Empirical Analysis, Advances in Project Scheduling. Elsevier. Amsterdam. 1989.
- [5] DEMEULEMEESTER, E.; HERROELEN, W., "A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem", Management Science, Vol.38., 1992
- [6] DREXL, A., "Scheduling of Project Networks by Job Assignment", Management Science, Vol.37, No.12, 1991.
- [7] DREXL; DOMSCHKE; SCHILD; SCHOLD; VOSS, Operations Research, Springer Verlag, Berlin, 1997.
- [8] DREXL, A.; KOLISH, R.; SALEWSKI, F., "Projektmanagement bei flexiblen Arbeitszeiten" Zeitschrift für Planung, Vol.10, 1999.
Ayrıntılar
Birincil Dil
Türkçe
Konular
-
Bölüm
Araştırma Makalesi
Yazarlar
Aykut Top
Bu kişi benim
Türkiye
Yayımlanma Tarihi
28 Haziran 2002
Gönderilme Tarihi
7 Mayıs 2002
Kabul Tarihi
3 Haziran 2002
Yayımlandığı Sayı
Yıl 2002 Cilt: 5 Sayı: 18