Application of Earned Value Based Metrics to Enhance the Performance Measurement of Engineering Project Management
Öz
Earned value management (EVM) includes cost control and considers resource planning and management techniques for schedule and technical performance. The present study aims to show the theoretical and practical dimension of performance measurement on a small-scale construction project using the earned value methodology, and thereby contribute to its wider practical application. In addition, the usage of the correlation between the schedule performance index and cost performance index and the meaning of indices such as budgeted cost of work scheduled, budget cost of work performed, and the actual cost of work performed is illustrated in detail to analyze the performance of EVM application in the project management.
Anahtar Kelimeler
Kaynakça
- Referans1 R. Avlijaš and G.; Avlijaš, Upravljanje projektom. Beograd: Univerzitet Singidunum, In Serbian, 2010.
- Referans2 S. Leu, A. Chen and C. Yang, “A GA-based fuzzy optimal model for construction time–cost trade-off”, International Journal of Project Management, 19(1), 47 – 58, 2001.
- Referans3 Q.W. Fleming and J.M. Koppelman, “Earned Value Project Management, Project Management Institute, Newtown Square, PA, 1996.
- Referans4 E. Kim, W.G. Wells and M.R. Duffey 2003. A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 21(5), 375 - 382.
- Referans5 Vandevoorde, S. & Vanhoucke, M. “A comparison of different project duration forecasting methods using earned value metrics”. International Journal of Project Management, 24(4), 289–302, 2005.
- Referans6 Lipke et al. “The probability of success”. The Journal of Quality Assurance Institute, January, 14–21, 2004.
- Referans7 Acebes et al. “Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring”. Procedia - Social and Behavioral Sciences, 74, 181-189, 2013.
- Referans8 Czemplik, A. “Application of Earned Value Method to Progress Control of Construction Projects”. Procedia Engineering, 91, 424-428, 2014.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Mühendislik
Bölüm
Konferans Bildirisi
Yazarlar
Muhammed Azim Eırgash
*
KARADENİZ TEKNİK ÜNİVERSİTESİ
Türkiye
Vedat Toğan
KARADENİZ TEKNİK ÜNİVERSİTESİ
Türkiye
Aynur Kazaz
AKDENİZ ÜNİVERSİTESİ
Türkiye
Yayımlanma Tarihi
27 Aralık 2017
Gönderilme Tarihi
29 Mayıs 2017
Kabul Tarihi
8 Kasım 2017
Yayımlandığı Sayı
Yıl 2017 Cilt: 6