Abstract
Disassembly is one of the steps of the recovery activities. Since it includes expensive processes, disassembly shoul be performed with the system that provides efficient and effective outputs. A disassembly line is the most suitable system for disassembly of the returned products. A disassembly line balancing problem (DLBP) is assigning disassembly tasks to consecutive workstations by satisfying a series of constraints and optimizing one or more than one goal. In this paper, the DLBP with multiple conflicting goals which takes into account the negative zone (DLBP-Z) constraints has been proposed. Negative zone constraint is related to hazardous parts. If there are hazardous part/parts in the product and they need to be removed, they may damage the othetr parts and disassembly line. Therefore, these parts must be assigned to different stations from the other parts. Goal programming (GP) and fuzzy goal programming (FGP) approaches have been proposed in order to optimize three conflicting goals, namely total net recovery profit value, the number of parts to be removed for recycling and cycle time. Through a numerical example, the proposed approaches have been tested and goal programming formulations have been shown to be valid and useful. To the best of the authors knowledge, the proposed GP and FGP models are the first multi citeria decision making (MCDM) approaches for DLBP-Z.
Keywords
Kaynakça
- M. Thierry, M. Salomon, J. Van Nunen, and L. Van Wassenhove, Strategic Issues in Product Recovery Management: 37 (2), 114–135, 1995. https://doi.org/ 10.2307/ 41165792.
- A. Gungor, and S.M. Gupta, Issues in environmentally conscious manufacturing and product recovery: a survey. Computers & Industrial Engineering, 36 (4), 811–853, 1999. https://doi.org/10.1016/S0360-8352(99)00167-9.
- M.A. Ilgin, and S.M. Gupta, Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. Journal of Environmental Management, 91 (3), 563–591, 2010.https://doi.org/10.1016/J.JENVMAN.2009.09.037.
- S.M. GUPTA, and K.N. TALEB, Scheduling disassembly.32 (8), 1857–1866, 2007. https://doi.org/ 10.1080/00207549408957046.
- A. Koc, I. Sabuncuoglu, and E. Erel, Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph. IIE Transactions (Institute of Industrial Engineers), 41 (10), 866–881, 2009. https://doi.org/10.1080/07408170802510390.
- A. Güngör, and S.M. Gupta, Disassembly line in product recovery. International Journal of Production Research, 40 (11), 2569–2589, 2002. https://doi.org/ 10.1080/00207540210135622.
- Ö. Tozanlı, E. Kongar, and S.M. Gupta, Trade-in-to-upgrade as a marketing strategy in disassembly-to-order systems at the edge of blockchain technology. https://doi.org/10.1080/00207543.2020.1712489, 58 (23), 7183–7200, 2020. https://doi.org/10.1080/ 00207543.2020.1712489.
- S. Agrawal, and M.K. Tiwari, A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem. International Journal of Production Research, 46 (6), 1405–1429, 2008. https://doi.org/10.1080/ 00207540600943985.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Endüstri Mühendisliği
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
14 Ocak 2022
Gönderilme Tarihi
28 Temmuz 2021
Kabul Tarihi
1 Aralık 2021
Yayımlandığı Sayı
Yıl 2022 Cilt: 11 Sayı: 1
APA
Hezer, S., & Kara, Y. (2022). Balancing disassembly line under hazardous parts with precise and fuzzy goals. Niğde Ömer Halisdemir Üniversitesi Mühendislik Bilimleri Dergisi, 11(1), 92-108. https://doi.org/10.28948/ngumuh.975730
AMA
1.Hezer S, Kara Y. Balancing disassembly line under hazardous parts with precise and fuzzy goals. NÖHÜ Müh. Bilim. Derg. 2022;11(1):92-108. doi:10.28948/ngumuh.975730
Chicago
Hezer, Seda, ve Yakup Kara. 2022. “Balancing disassembly line under hazardous parts with precise and fuzzy goals”. Niğde Ömer Halisdemir Üniversitesi Mühendislik Bilimleri Dergisi 11 (1): 92-108. https://doi.org/10.28948/ngumuh.975730.
EndNote
Hezer S, Kara Y (01 Ocak 2022) Balancing disassembly line under hazardous parts with precise and fuzzy goals. Niğde Ömer Halisdemir Üniversitesi Mühendislik Bilimleri Dergisi 11 1 92–108.
IEEE
[1]S. Hezer ve Y. Kara, “Balancing disassembly line under hazardous parts with precise and fuzzy goals”, NÖHÜ Müh. Bilim. Derg., c. 11, sy 1, ss. 92–108, Oca. 2022, doi: 10.28948/ngumuh.975730.
ISNAD
Hezer, Seda - Kara, Yakup. “Balancing disassembly line under hazardous parts with precise and fuzzy goals”. Niğde Ömer Halisdemir Üniversitesi Mühendislik Bilimleri Dergisi 11/1 (01 Ocak 2022): 92-108. https://doi.org/10.28948/ngumuh.975730.
JAMA
1.Hezer S, Kara Y. Balancing disassembly line under hazardous parts with precise and fuzzy goals. NÖHÜ Müh. Bilim. Derg. 2022;11:92–108.
MLA
Hezer, Seda, ve Yakup Kara. “Balancing disassembly line under hazardous parts with precise and fuzzy goals”. Niğde Ömer Halisdemir Üniversitesi Mühendislik Bilimleri Dergisi, c. 11, sy 1, Ocak 2022, ss. 92-108, doi:10.28948/ngumuh.975730.
Vancouver
1.Seda Hezer, Yakup Kara. Balancing disassembly line under hazardous parts with precise and fuzzy goals. NÖHÜ Müh. Bilim. Derg. 01 Ocak 2022;11(1):92-108. doi:10.28948/ngumuh.975730