Payback Periods of Three Identical Solar Photovoltaic Power Plants
Öz
Payback periods of three (I, II and III) identical solar photovoltaic power plants (SPPs) have been determined in this paper. SPPs were installed in Adıyaman location, Turkey (Latitude: 37.45°, Longitude: 38.17° and Altitude: 672m) in 2017. Date of commencement of operation is November 27, 2017, the installed power capacity is 1.025 MW, and the installation cost is $1000000 of each SPP. The supply method for installation is 100% equity capital and the sales price of the electricity to the grid is 0.133$/kWh. The results of the work showed that the average annual electricity generation was 1696665kWh of each SPP. The internal electric consumption is 10770kWh. Thus, net electricity generation was 1685895kWh. The average payback period was 5.5 years for these SPPs.
Anahtar Kelimeler
Kaynakça
- [1] Chandel, M., Agrawal, G.D., Mathur, S., and Mathur, A., (2014). Techno-Economic Analysis of Solar Photovoltaic Power Plant for Garment Zone of Jaipur City. Case Studies in Thermal Engineering, 2, 1-7.
- [2] Costa, S.C., Diniz, A.S.A., and Kazmerski, L.L., (2016). Dust and Soiling İssues and İmpacts Relating to Solar Energy Systems: Literature Review Update for 2012–2015. Renewable and Sustainable Energy Reviews, 63, 33-61.
- [3] Darwish, Z.A., Kazem, H.A., Sopian, K., Al-Goul, M.A., and Alawadhi, H., (2015). Effect of Dust Pollutant Type on Photovoltaic Performance. Renewable and Sustainable Energy Reviews, 41, 735-744.
- [4] Foster, R., Ghassemi, M., and Cota, A., (2010). Solar Energy: Renewable Energy and the Environment (Chapter: 9, pp:231-246), First ed. CRC.
- [5] Goura, R., (2015). Analyzing the On-Field Performance of a 1-Megawatt-Grid-Tied PV System in South India. International Journal of Sustainable Energy, 34(1):1-9.
- [6] Kazem, H.A., Albadi, M.H., Al-Waeli, A.H., Al-Busaidi, A.H., and Chaichan, M.T., (2017). Techno-Economic Feasibility Analysis of 1 MW Photovoltaic Grid Connected System in Oman. Case studies in Thermal Engineering, 10, 131-141.
- [7] Ketjoy, N. and Konyu, M., (2014). Study of Dust Effect on Photovoltaic Module for Photovoltaic Power Plant. Energy Procedia, 52, 431-437.
- [8] Khatri, R., (2016). Design and Assessment of Solar PV Plant for Girls Hostel (GARGI) of Mnit University, Jaipur City: A case Study. Energy Reports, 2, 89-98.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yayımlanma Tarihi
26 Ekim 2019
Gönderilme Tarihi
9 Nisan 2019
Kabul Tarihi
5 Ağustos 2019
Yayımlandığı Sayı
Yıl 1970 Cilt: 14 Sayı: 4