ENERJİ-ETKİN ESNEK ATÖLYE TİPİ MAKİNE ÇİZELGELEME PROBLEMİ İÇİN ÇOK AMAÇLI BİR MATEMATİKSEL MODEL
Öz
Anahtar Kelimeler
Enerji Etkin Çizelgeleme, Esnek Atölye Tipi Makine Çizelgeleme, Yeniden Dolaşım, Makine Uygunluk Kısıtları, Toplam Ağırlıklı Tamamlanma Zamanı
Kaynakça
- Aqel, G. A., Li X. ve Gao L. (2019). A modified iterated greedy algotihm for flexible job shop scheduling problem. Chinese Journal of Mechanical Engineering, 32 (21). doi: https://doi.org/10.1186/s10033-019-0337-7
- Deliktaş, D., Torkul O. ve Üstün Ö. (2019). A flexible job shop cell scheduling with sequence-dependent family setup times and intercellular transportation times using conic scalarization method. International Transactions in Operational Research, 26 (6), 2410-2431. Erişim adresi: https://onlinelibrary.wiley.com/doi/epdf/10.1111/itor.12407
- Demircioğlu, M. (2019). Yapay sinir ağları kullanarak enerji tasarruflu atölye tipi çizelgeleme. Çukurova Üniversitesi Sosyal Bilimler Enstitüsü Dergisi, 28 (3), 143-154. doi: https://doi.org/10.35379/cusosbil.644997
- French, S. (1982). Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop. New York: Ellis Horwood Series.
- Karabulut, M. A. ve Saraç, T. (2019). Kapasite kısıtlı esnek atölye tipi çizelgeleme problemi için üç aşamalı bir çözüm yaklaşımı ve bir işletmede uygulanması. Eskişehir Osmangazi Üniversitesi Mühendislik ve Mimarlık Fakültesi Dergisi, 27 (3), 233-241. doi: http://dx.doi.org/10.31796/ogummf.613268
- Meng, L., Zhang, C., Shao, X. ve Ren, Y. (2019). MILP models for energy-aware flexible job shop scheduling problem. Journal of Cleaner Production, 210, 710-723. doi: https://doi.org/10.1016/j.jclepro.2018.11.021
- Mousakhani, M. (2013). Sequence-dependent setup time flexible job shop scheduling problem to minimise total tardiness. International Journal of Production Research, 51 (12), 3476-3487. doi: https://doi.org/10.1080/00207543.2012.746480
- Salido, M. A., Escamilla, J., Giret A. ve Barber, F. (2016). A genetic algorithm for energy-efficiency in job-shop scheduling. International Journal of Advanced Manufacturing Technology, 85, 1303-1314. Erişim adresi: https://link.springer.com/content/pdf/10.1007/s00170-015-7987-0.pdf
- Saraç, T., Sipahioğlu, A. ve Akyol Özer, E. (2020). A two-stage solution approach for plastic injection machines scheduling problem. Journal of Industrial and Management, 13 (5). doi: http://dx.doi.org/10.3934/jimo.2020022
- Wang, H., Jiang, Z., Wang, Y., Zhang, H. ve Wang, Y. (2018). A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization. Journal of Cleaner Production, 188, 575-588. doi: https://doi.org/10.1016/j.jclepro.2018.03.254